My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-05-01) 172nd St. Roadway Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2011 11:58:40 AM
Creation date
1/28/2011 11:57:31 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
172nd St. Roadway Improvements
Bid No. (xx-xx-xx)
07-05-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1.06 <br /> <br />06/07 <br /> <br />2. Immediately on delivery, inspect shipments to assure compliance with <br />requirements of Contract Documents and approved submittals, and that <br />Products are properly protected and undamaged. <br /> <br />B. Provide equipment and personnel to handle Products by methods to prevent <br />soiling or damage to Products or packaging. <br /> <br />STORAGE AND PROTECTION <br /> <br />A. The Contractor shall furnish a covered, weather protected storage structure <br />providing a clean, dry, non-corrosive environment for all mechanical equipment, <br />valves, electrical and instrumentation equipment, and special equipment to be <br />incorporated into this project. Storage of equipment shall be performed to allow <br />easy access and be in strict accordance with the "instructions for storage" of each <br />equipment supplier and manufacturer including weather/humidity protection, <br />connection of heaters, placing of storage lubricants in equipment, blocking, or <br />skid storage, etc. Corroded, damaged or deteriorated equipment and parts shall <br />be replaced before acceptance of the project. Equipment and materials not <br />properly stored will not be included in a payment estimate. <br /> <br />B. Store Products in accordance with manufacturer's instructions, with seals and <br />labels intact and legible. <br /> <br />1. Store products subject to damage by the elements in weather-tight <br />enclosures. <br /> <br />2. Maintain temperature and humidity within the ranges required by <br />manufacturer's instructions. <br /> <br />3. Store fabricated products above the ground on blocking or skids, prevent <br />soiling or staining. Cover products which are subject to deterioration with <br />impervious sheet coverings, provide adequate ventilation to avoid <br />condensation. <br /> <br />4. Store loose granular materials in a well drained area on solid surfaces to <br />prevent mixing with foreign matter. <br /> <br />5. All unlabeled or improperly labeled materials shall be removed from the <br />project site. <br /> <br />C. All materials and equipment to be incorporated in the work shall be handled and <br />stored by the Contractor before, during, and after shipment in a manner to <br />prevent warping, twisting, bending, breaking, chipping, rusting, and any injury, <br />theft or damage of any kind whatsoever to the material or equipment. <br /> <br />D. Cement, sand and lime shall be stored under a roof and off the ground and shall <br />be kept completely dry at all times. All structural and miscellaneous steel, and <br />reinforcing steel shall be stored off the ground or otherwise to prevent <br />accumulations of dirt or grease, and to minimize rusting. Brick, block and similar <br />masonry products shall be handled and stored in a manner to reduce breakage, <br />chipping, cracking, and spalling to a minimum. <br /> <br />01600-3 <br /> <br />03-4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.