My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-05-01) 172nd St. Roadway Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2011 11:58:40 AM
Creation date
1/28/2011 11:57:31 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
172nd St. Roadway Improvements
Bid No. (xx-xx-xx)
07-05-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />,- <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Add the following after Paragraph 6.08: <br /> <br />"6.08.A. The OWNER will secure and pay for only the following governmental <br />charges and inspection fees: <br /> <br />a. special assessments, <br />b. capital connection fees, <br />c. threshold and special inspection fees, <br />d. permanent utility meter installation fees, <br />e. permanent utility hook-up fees, and <br />f. impact fees. <br /> <br />6.08.8. CONTRACTOR shall pay for all building permits and charges of utility <br />owners for connections to the Work, and OWNER will pay charges of such utility <br />owners for capital costs related thereto such as plant investment fees." <br /> <br />Add the following after the last sentence in Paragraph 6.10: <br /> <br />In accordance with Exhibit A hereto, entitled Tax Exemption Agreement to <br />Contract, the Owner may directly purchase all materials and equipment identified <br />in the Contract Documents for incorporation into the Project ("Owner-Provide <br />Materials"). <br /> <br />Delete the last sentence of Paragraph 6.12. and substitute the following: <br /> <br />"These shall be available to ENGINEER for examination during construction <br />and shall be delivered "to ENGINEER for OWNER upon Substantial Completion <br />of the Work." <br /> <br />At the end of Paragraph 6.13.8, add the following sentences: <br /> <br />"The Occupational Safety and Health Administration excavation safety <br />standards, 29 CFR 1926.650 Subpart P trench safety standards are in effect <br />during the period of construction of the Project. In compliance with current State <br />of Florida statutes, the Contractor or subcontractor performing trench excavation <br />work on the Project shall comply with the applicable trench safety standards." <br /> <br />In the sixth line of Paragraph 6.20.A., change the parenthetical insert to read as follows: <br /> <br />"...(including but not limited to fees and charges of ENGINEER, other engineers, <br />architects, attorneys and other professionals, particularly including, but not <br />limited to reasonable ENGINEER's attorney's fees, and court costs)...". <br /> <br />ARTICLE 9 - ENGINEER'S STATUS DURING CONSTRUCTION <br /> <br />Change the first sentence of Paragraph 9.01.A. to read as follows: <br /> <br />"If OWNER and ENGINEER agree, ENGINEER will be OWNER's repre- <br />sentative during the construction period." <br /> <br />Final Version 6/07 <br /> <br />00800-6 <br /> <br />03-4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.