My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-05-01) 172nd St. Roadway Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2011 11:58:40 AM
Creation date
1/28/2011 11:57:31 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
172nd St. Roadway Improvements
Bid No. (xx-xx-xx)
07-05-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I; <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />ARTICLE 10 - CHANGES IN THE WORK: CLAIMS <br /> <br />Add the following: <br /> <br />"10.06. Without invalidating the agreement, Owner may, at any time execute <br />appropriate Change Orders for additions and/or deletions in the work of up to <br />25% of the total contract amount, without a change in the contract unit prices <br />bid." <br /> <br />ARTICLE 13 - TESTS AND INSPECTIONS; CORRECTION, <br />REMOVAL OR <br />ACCEPTANCE OF DEFECTIVE WORK <br /> <br />13.03. TEST AND INSPECTIONS: <br /> <br />Replace 13.03.B. with: <br /> <br />"All testing shall be paid for by the Contractor." <br /> <br />Add the following sentence to Paragraph 13.07.A.: <br /> <br />"Specific and special warranties specified in the Contract Documents are in <br />addition to, and not in lieu of, the contractors general warranty. CONTRACTOR <br />shall not be relieved of general warranty obligations by the specification of <br />specific products or procedures." <br /> <br />13.09. In the first sentence of the paragraph OWNER, MAY CORRECT DEFECTIVE WORK: c <br /> <br />Change the first line from ": <br /> <br />If Contractor fails within a reasonable time after written notice of Engineer..." t <br /> <br />To read: <br /> <br />If Contractor fails within ten (10) calendar days after written notice of <br />Engineer..." <br /> <br />ARTICLE 14 - PAYMENTS TO CONTRACTOR AND COMPLETION <br /> <br />In the first sentence of Paragraph 14.02.A.1., change the phrase "At least twenty days before <br />each progress payment is scheduled (but not more often than once a month), ..." to read: <br /> <br />"By no later than the first day of the month, .. .". <br /> <br />Following Paragraph Add 14.02.A.34 add:: <br /> <br />4. "An original Partial Release of Lien is required from the General <br />Contractor along with the application for Payment No. 1 and for each <br />subsequent application thereafter. For each application for payment <br />(excluding Application No.1) the Contractor shall submit with the <br /> <br />Final Version 6/07 <br /> <br />00800-7 <br /> <br />03-4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.