My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pistorino & Alam Consulting
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-04-02) Heritage Park Parking Garage
>
Responses
>
Pistorino & Alam Consulting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2011 4:55:17 PM
Creation date
1/28/2011 4:54:24 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Heritage Park Parking Garage
Bid No. (xx-xx-xx)
07-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />PISTORINO & ALAM CONSULTING ENGINEERS, INC. <br /> <br />PARKING GARAGE PROJECTS <br /> <br />Client: <br />Phone: <br />Contact: <br />Project Manager: <br />Type of Facility <br />Start Date: <br /> <br />MGE <br />305-444-0413 <br />Peter Goicuria, AlA <br />John C. Pistorino, P.E. / Nasir M. Alam, P.E. / Tahir Iqbal, P.E. <br />Medical Office Building and South Miami Parking Garage <br />2002 Completion: 2005 <br /> <br />Description: This five-story parking garage has 680 parking spaces with the option of a five-story <br />extension on top. We performed Value Analysis & Life Cycle Costing for this structure. The total cost of <br />the project was 5.3 million dollars. This project was completed two months prior to the scheduled <br />completion time and was completed under budget. Construction cost for this parking garage was below <br />7,500.00 per parking space, <br /> <br />Client: <br />Phone: <br />Contact: <br />Project Managers: <br /> <br />Miami Dade Transit Agency <br />305-375-4504 <br />Mr. Surinder Sahota, P.E. <br />John C. Pistorino, P.E. / Nasir M. Alam, P.E. / Tahir Iqbal, P.E.I <br />Manny Garcia, P.E. <br />South Miami Metrorail Station Parking Garage Extension Project <br />1999-2002 <br /> <br />Type of Facility <br />Start Date: <br /> <br />Description: This office provided design, site planning, paving, grading, drainage, water and sewer <br />services for the South Miami Metrorail Station Parking Garage Extension. <br /> <br />Client: <br />Contact: <br />Project Managers: <br /> <br />Baptist Hospital of Miami Parking Garage No.5 <br />Saltz Michelson Architects <br />John C. Pistorino, P.E. / Nasir M. Alam, P.E. / Tahir Iqbal, P.E.I <br />Manny Garcia, P.E. <br />Parking Garage Design <br />2005 - Present <br /> <br />Type of Facility <br />Start Date: <br /> <br />Description: Our office is currently providing civil design services for a parking garage at one the <br />Baptist Hospital's facility. <br /> <br />Client: <br />Project Managers: <br /> <br />Mount Sinai Hospital <br />John C. Pistorino, P.E. / Nasir M. Alam, P.E. / Tahir Iqbal, P.E.I <br />Manny Garcia, P.E. <br />Parking Garage Design <br />2005 - Present <br /> <br />Type of Facility <br />Start Date: <br /> <br />Description: Our office is currently providing structural and civil design for a ] O-story parking garage <br />at Mount Sinai Hospital. <br /> <br />Client: <br />Project Managers: <br /> <br />South Dade Community Blood Bank Center <br />John C. Pistorino, P.E. / Nasir M. Alam, P.E. / Tahir Iqbal, P.E.I <br />Manny Garcia, P.E. <br />Site Development including Parking Garage lot layout <br />2002 - 2004 <br /> <br />Type of Facility <br />Start Date: <br /> <br />Description: Site Development of a two-acre site, including a parking lot layout to accommodate <br />approximately] 00 passenger vehicles and numerous buses. <br /> <br />Design Projects <br /> <br />Page I <br />
The URL can be used to link to this page
Your browser does not support the video tag.