Laserfiche WebLink
<br />- <br /> <br />I <br />I <br />I <br /> <br />PISTORINO & ALAM CONSULTING ENGINEERS, INC. <br /> <br />PARKING GARAGE PROJECTS <br /> <br />I <br /> <br />Client: <br />Project Manager: <br />Type of Facility <br /> <br />Dade County Aviation Department <br />John C. Pistorino, P.E. / Nasir M. Alam, P.E. / Tahir Iqbal, P.E. <br />Three 7 Story Parking Garages <br /> <br />,I <br /> <br />Description: This office provided design and construction phase services for the three parking garages <br />at Miami International Airport. <br /> <br />I <br />I <br /> <br />Client: <br />Project Managers: <br /> <br />Jackson Memorial Hospital <br />John C. Pistorino, P.E. / Nasir M. Alam, P.E. / Tahir Iqbal, P.E.! <br />Manny Garcia, P.E. <br />Redesign northern portion of the campus to accommodate the new <br />DTC and energy facility. <br /> <br />Type of Facility <br /> <br />Description: Design included new interior roadway and parking lots. <br /> <br />I <br />I <br /> <br />Client: Arquitectonica <br />Phone: 305-372-1812 <br />Contact: Mr. Sergio Bakas, AlA <br />Project Manager: Nasir M. Alam, P.E., Tahir Iqbal, P.E. <br />Start Date: 2004 Completion: 2005 <br />Facilities: Majellan Condominium -Two 40 Story Condominium Tower and <br />Eight Story - Parking Garage - Pool Deck and Support Structures. <br /> <br />I <br />I <br /> <br />Description: Establish the structural design criteria with Owner/Architect. Make recommendations <br />and provide designs on areas where the criteria are not established. Preparation of drawing sand <br />specifications related to design of structural of the building. Provide limited construction administration, <br />contract documents, structural calculations, contract drawings and technical specifications. <br /> <br />I <br /> <br />Client: <br />Phone: <br />Contact: <br />Project Manager: <br />Type of Facility: <br /> <br />MGE <br />305-444-0413 <br />Peter Goicuria, AlA <br />Nasir M. Alam, P.E. / Tahir Iqbal, P.E. <br />Baptist Hospital Parking Garage and Dietary Expansion Project <br /> <br />I <br />I <br /> <br />Description: This office provided design and construction phase services for the parking garage. The <br />existing court-yard south of the cafeteria will be enclosed by a new structure. Various utilities had to be <br />relocated, <br /> <br />I <br /> <br />Client: <br />Type of Facility: <br />Budget: <br />Start Date: <br />Key Individuals: <br /> <br />City of South Miami - Hatcher, Ziegler, Gunn & Associates <br />South Miami Public Works Building, City of South Miami <br />$800,000 Actual: Within Budget <br />1994 Completion: June, 1995 <br />John C. Pistorino, P.E. / Manuel D. Garcia, P.E. / Nasir M. Alam, P.E. <br />Tahir Iqbal, P.E. <br /> <br />I <br /> <br />I <br /> <br />Description: Structural and Civil Engineering design of major addition to the existing Public Works <br />building of City of South Miami. Facility consists of Public Works maintenance truck repair and <br />storage facility. Structural systems consists of cast-in-place reinforced concrete columns and beams, <br />Roofframing is supported by pre-cast, prestressed concrete joists with cast-in-place reinforced <br /> <br />I <br />I <br /> <br />Design Projects <br /> <br />Page 2 <br />