Laserfiche WebLink
<br />- <br /> <br />I <br />I <br />I <br /> <br />PISTORINO & ALAM CONSULTING ENGINEERS, INC. <br /> <br />PARKING GARAGE PROJECTS <br /> <br />concrete slab. Floor slab is designed to support the loads of heavy trucks. <br /> <br />I <br /> <br />Also included in the scope of work was site planning, paving, grading, drainage, sewer, water, and <br />parking layout and design. Construction phase engineering and inspection services were also provided for <br />this project. <br /> <br />I <br />I <br />I <br />I <br />I <br /> <br />Client: <br />Type of Facility: <br />Budget: <br />Start Date: <br />G. Key Individuals: <br /> <br />Dade County Aviation Dept. - Calvin & Giordano <br />Cargo Building 2222, 2224 and 2226 <br />$14,500 Actual: N/A <br />1992 Completion: 1998 <br />John C. Pistorino, P.E. . Manuel D. Garcia, P.E. <br />Nasir M. Alam, P.E. Tahir Iqbal, P.E. <br /> <br />Description: The design and construction phase services for the concrete apron to service belly <br />cargo planes at the cargo buildings. The work included concrete apron pavement, drainage, <br />water, sewer, parking and site grading. In particular, the coordination and phasing of a very <br />complex construction site. Florida Power and Light's substation had to be temporally <br />accommodated as the cargo building was constructed around it while protecting the substation <br />from the Jet blast. <br /> <br />Also included was coordination with three separate projects on the same site as well as planning <br />for the construction of three cargo buildings in the U shape surrounding the site. Drainage had to <br />be designed <br /> <br />I <br /> <br />I <br />I <br /> <br />Client: Dade County Aviation Department, Mr. Jerry Mitchell, (305) 876-8330 <br />Type of Facility: Parking Garage Investigation, Redesign of selected structural <br />components, analysis of the existing construction. <br />Budget: Investigation, N/ A <br />Start Date: August, 1996 <br />Key Individuals: Nasir M. Alam, P.E. <br /> <br />Actual: Investigation, N/A <br />Completion: October 1997 <br />John C. Pistorino, P.E. Tahir Iqbal, P.E. <br /> <br />I <br /> <br />Description: The investigation of MIA Parking Garage No.7. is currently under construction. Cracks <br />in the beams and columns were observed during construction. P & A performed a complete structural <br />analysis and review to verify the adequacy of the original design. Investigation of in-place <br />construction was performed to determine the cause of cracks in the post tensioned beams. <br />Specific tasks included the investigation of the following structural components of the parking garage. <br />1- Post tensioned beams and girders with cracks, displaced and ungrouted tendon ducts, <br />Investigation required crack survey and monitoring, impulse radar survey, x-rays, structural <br />analysis and repair recommendations. Also included is review of the original design, structural <br />analysis and review of the proposed repairs. <br />2- Evaluation of the cracks in column and post tensioned beam core joints, field survey ofthe <br />cracks, petrographic examination of the concrete, structural analysis and repair recommendations. <br />3- Review of the cracks in the gap structure beams, structural analysis, recommendation of repairs, <br />design of repairs and field monitoring. <br />4- Investigation, analysis and repair recommendations for ripples in the parking deck slabs, <br />vibrations in the parking deck, cracks in the elevator lobby slabs, cracks in the retaining wall, <br />cracks in the rail walls and evaluation of the columns with reduced concrete compressive strength. <br />5- Cost estimate and life cycle cost evaluation for various components of the existing structure, <br />repairs and comparison of various alternates. <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Design Projects <br /> <br />Page 3 <br />