<br />.
<br />
<br />I
<br />
<br />I
<br />
<br />
<br />MGE Architects Similar Project Experience
<br />
<br />I
<br />
<br />600 CAR PARKING GARAGE
<br />SOUTH MIAMI HOSPITAL
<br />MEDICAL ARTS BUILDING AND
<br />PARKING GARAGE ......................
<br />Miami, Florida
<br />Mr. Tom Tulloch
<br />(305) 412-2919
<br />
<br />The parking garage, which is linked to South Miami Hospital by a covered
<br />pedestrian bridge, provides 600 car spaces for patients, visitors and staff.
<br />Scheduled for a Summer 2005 completion, along with the 95,000 sf medical arts
<br />building...", ... ",,,,.,,.,,,,,,,.,,.,,,, .", """..,,,....,,,,,,,,,,,, ""..",,,,,,,,,,,.,,.,,,, "" ",,,$30,000,000
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />743 CAR PARKING STRUCTURE, Nine level parking structure. incorporates 100% precast system for maximum
<br />SMH PARKING GARAGE.................................. efficiency in construction time and ease of maintenance"".".""."."".."".$ 7,500,000
<br />South Miami, Florida
<br />Mr. Tom Tulloch
<br />(305) 412-2919
<br />
<br />I
<br />
<br />825 CAR PARKING STRUCTURE,
<br />SOUTH MIAMI HOSPITAL................................ An innovative design solution, responding to the triangular site, provides a central
<br />South Miami, Florida atrium with a helical parking ramp on the perimeter. First floor houses some support
<br />Mr. Tom Tulloch areas of the hospitaL."."".""."".".",,,,,,,.,,.,,,,,,,,.,,.,,,,,,.,,.,,,,.,,,,,,.,,.,,,,".,,$ 4,000,000
<br />(305) 412-2919
<br />
<br />I
<br />
<br />I
<br />
<br />1,100 CAR PARKING STRUCTURE,
<br />BOCA RATON COMM. HOSPITAL................... Complete planning and design for seven level parking structure with double ramps
<br />Boca Raton, Florida to accommodate the traffic loads. The exterior was designed to meet the stringent
<br />Mr. Thomas Rutherford city codes"" """..""""..".",.".".'''''''' '''''''''''' '" """""" ,,,,.,,.,,..,,, "" "".",,$ 12,000,000
<br />(561) 393-4091
<br />
<br />I
<br />
<br />650 CAR PARKING STRUCTURE,
<br />KENDALL REGIONAL HOSPITAL..............
<br />Miami, Florida
<br />Victor Maya, Chief Executive Officer
<br />(305) 227-5500
<br />
<br />Attached to an Office Building via covered walks, this structure has a central ramp
<br />with level parking on either side to permit assigned parking, The exterior was
<br />designed to disguise the use and to blend with the surrounding
<br />
<br />area." "., '" "" "..,,,,,,,,,,,,,,, "" ."., ,,' ,,,. "', ". "..,,,. '"'''''''''' '" '" .". "" ".., ". """'" ,$5,200,000
<br />
<br />I
<br />
<br />I
<br />
<br />750 CAR PARKING STRUCTURE,
<br />BAPTIST HOSPiTAL....................................... Five level parking structure with a completion date of December 1999". ". "HH "H""
<br />Miami, Florida 'H'" "H" "'''H'' "H" ," H'''' H' "H.'H' H'H'''' 'H'H'" "H" '" "H"'H H....H HH.$ 7,500,000
<br />Mr. Tom Tulloch
<br />(305) 412-2919
<br />
<br />I
<br />
<br />I
<br />
<br />PARKING STRUCTURE,
<br />HOLY CROSS HOSPITAL .............................
<br />Ft Lauderdale, Florida
<br />Ms, Diana Ballard
<br />(954) 958-4855
<br />
<br />Design studies were done for the southwest corner of this Broward County hospital
<br />site to study options to accommodate a parking structure. Layouts were done, varying
<br />from 240 car, three level structure to a 550-car solution with six levels, Cost estimates
<br />were prepared and exterior elevations and traffic studies were
<br />done,.", '''' ". "" "" '''''''' "" .".,,,,,,, "".." ".. '"'''''''''''' "'" '" ."."",,,, ", "" "..,,, '" ",$ 3,000,000
<br />
<br />I
<br />
<br />I
<br />
<br />265 PARKING GARAGE
<br />PARK ONE PARKING GARAGE ..................
<br />Miami Beach, Florida
<br />Chapman Decote
<br />(305) 891-0060
<br />
<br />Parking structure for 265 vehicles. A mixed use facility, the ground floor is designed
<br />for retail spaces, leaving the upper five levels for parking. The fayade is designed to
<br />mimic the massing of surrounding hotels and buildings """."".." .""""."", $6,000,000
<br />
<br />I
<br />
<br />I
<br />
<br />-""
<br />':i4:'~
<br />
<br />MGE
<br />
<br />I
<br />
|