My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pistorino & Alam Consulting
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-04-02) Heritage Park Parking Garage
>
Responses
>
Pistorino & Alam Consulting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2011 4:55:17 PM
Creation date
1/28/2011 4:54:24 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Heritage Park Parking Garage
Bid No. (xx-xx-xx)
07-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />,-- <br />I <br />I <br />I <br /> <br />had to be made to accommodate existing services and utilities. In many cases sewage flow had to be <br />reversed to eliminate the need for lift stations <br /> <br /> <br />. Extension of Metrorail to Palmetto Expressway including elevated structure for train <br />track, ground improvements, Metrorail stations, infrastructure and parking facility. <br /> <br />Homestead Housing (lml Urban Autllority- <br />Project: Affordable Housing Project Civil engineering services, <br />including planning, layout, site development, roadways, water and <br />sewer design, and construction phase services. <br /> <br />I <br />I <br /> <br /> <br />Pines Boulevard Impro vements from 1-75 to Flamingo Road <br />Developed design for widening of Pines Boulevard from four (4) lanes divided to <br />eight (8) lanes divided. The project involved drainage improvements, signalization, <br />pavement marking and signage. The improvements were designed per FOOT <br />specifications and the project is closely coordinated with FOOT. The project also <br />involved close coordination with the City of Pembroke Pines and the area residents. <br /> <br />I <br />I <br />II <br />I <br />I <br />I <br /> <br />Our firm has been a consultant to the Dade County Building and Zoning Department <br />and Board of Rules and Appeals since 1974. Our responsibility in this capacity has <br />been to make recommendations and provide investigative research pertaining to: <br />amendments to the South Florida Building Code, the Florida Building Code FBC <br />2001 and FBC 2004, Plans Review and Processing. <br /> <br />Presently we serve as a Structural Engineering Consultant to: <br /> <br />Y The City of Miami <br />y Miami Dade County Public School <br />y Miami Dade County Building Code Compliance Office <br />y The City of Miami Beach <br />y Miami Dade County Building Department <br /> <br />The City of Hollywood <br />The School Board of West Palm Beach <br />Miami Division Emergency Center <br />The City of Coral Gables <br /> <br />In the past we have provided services as an Engineering Consultant to the following governmental <br />agencIes: <br /> <br />y Miami Dade Building Department <br />y Miami Dade Transit Agency <br />Y The City of Key West - Police Station <br />Y Monroe County - Court House <br />Y Veteran's Administration Medical Center <br />Y City of North Miami <br /> <br />Miami Dade County A viation Department <br />The City of Key West - Fire Station <br />The City of South Miami - Police Station <br />Florida Keys Community College <br />U.S. Coast Guard - Miami <br />Villas of Isle Morada <br /> <br />I <br /> <br />I <br />I <br />I <br /> <br />Pistorino & Alam recognizes that the success of a project depends on the quality, capabilities, <br />experience and dedication of the assigned personnel. Our team possesses these characteristics, which will <br />assure success for the project. P&A is a multi-disciplined engineering firm that has been practicing <br />engineering n South Florida for over 40 years. <br /> <br />We firmly believe that we have assembled a strong and able team of professionals to provide the services to <br />the standards and satisfaction of the City of Sunny Isles Beach. We are herewith enclosing a letter of <br />Response. We would welcome the opportunity to meet the Selection Committee to present our <br />qualification at the Oral Presentations. <br /> <br />Very trul your$:/ <br />PIST~..rAM CONSULTING ENGINEERS, INC. <br /> <br /> <br />John C. Pistorino, P.E. <br />Principal <br />O:\PRESENT A TIONS\SUBM ITT ALS\070402\Response,doe <br /> <br />I <br /> <br /> <br />Page 4 <br /> <br /><A. PISTORINO & ALAM CONSULTING ENGINEERS, INC. <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.