Laserfiche WebLink
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />Therefore, the selected management team for this contract, which satisfies these objectives, is <br />our Regional Transportation Planning Manager (Eric Penfield, P.E.) and Vice <br />President (Michael L. Davis). <br /> <br />Eric Penfield, P.E. <br />Regional Transportation Planning Manager <br />90 I Northpoint Parkway, Suite I 03 <br />West Palm Beach, FL 33407 <br />Office Phone - (561) 682-1095 <br />Office Fax - (561) 682-1925 <br />Epenfield@keithandschnars.com <br /> <br />Michael Davis <br />Vice President <br />6500 North Andrews Avenue <br />Fort Lauderdale, FL 33309 <br />Office Phone - (954) 776-/6/6 <br />Office Fax- (954) 771-7690 <br />Mdavis@keithandschnars.com <br /> <br />Eric Penfield, P.E., has been specifically selected to lead this Team. He has over II years of <br />experience providing municipal engineering services for a multitude of cities in south Florida, <br />including the City of Sunny Isles Beach for the past five years. His services have included <br />performing traffic engineering reviews of site plans, plats, land use change applications, and <br />master plans; parking demand and supply studies for projects ranging in size from a local <br />shopping center to 5 downtown square blocks; traffic safety studies; traffic concurrency study <br />reviews; queuing analyses. signal warrant and stop-sign control studies; as well as providing <br />expert witness testimony during quasi-judicial hearings on behalf of many municipalities. Mr. <br />Penfield has also previously provided transportation engineering consulting services to the city in <br />the past, and has intimate knowledge of the issues that the City of Sunny Isles Beach faces. <br /> <br />Additional senior staff members selected to serve the City include John Kuretski, P.E., <br />Deputy Project Manager for Structural Engineering Services, Mark Kline, P.E., Deputy Project <br />Manager for Roadway Design Services, Bruce Reed, R.L.A., Deputy Project Manager for <br />Landscape Architect Services, John Krane, P.E., Deputy Project Manager for Transportation <br />Planning, Lou Aurigemma, P.E., Deputy Project Manager for Civil Services. Kim Giles, who <br />coordinates our Public Involvement section. Bob Krisak, P.S.M., Deputy Project Manager for <br />Surveying Services, John Abbott, P .G., Deputy Project Manager for Environmental Services, <br />and Phil Cleland, P.E., Deputy Project Manager for CEI Services. This team we have <br />assembled includes our most experienced and respected professionals, who will be backed up, <br />at all times, throughout the life of this contract, by a network of technical and administrative <br />support staff, all of whom share a commitment to preparing work products that ensure that the <br />goals and objectives of our clients are consistently met in terms of function, form. schedule, and <br />project cost-effectiveness. <br /> <br />We look forward to working closely with the City in the near future and should you have any <br />questions regarding our firm, please contact me at your convenience. We are ready to begin <br />work! <br /> <br />Respectfully submitted, <br /> <br />~~ Jfl~ <br /> <br />Michael L. Davis <br />Vice President <br />Environ mental/Govern ment Affairs/Plan n i ng <br /> <br />-- <br /> <br />= Ir.~:: KEITH and SCHNARS, P.A. <br />': ll.:lrl:'I ::' ENGINEERS, PLANNERS, SURVEYORS <br /> <br />-- <br />