My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RS&H
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-07-01) Prof. General Engineering
>
Responses
>
RS&H
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2011 1:30:15 PM
Creation date
2/18/2011 1:29:39 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
P.E.
Bid No. (xx-xx-xx)
07-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />..- <br /> <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />o <br /> <br /> <br />PROFESSIONAL GENERAL ENGINEERING CONSULTANT <br /> <br />RFQ # 07-07-01 <br /> <br />Of SUN <br /> <br />& Recreation, as well as the City of Miami, City of Coral Gables, City of North Miami, <br />City of Miami Beach, and many other cities, counties, transit and highway authorities <br />and airports will be an asset to the City of Sunny Isles Beach. Our client base also <br />includes private sector organizations who are interested in developing transportation <br />system elements throughout the state. <br /> <br />I TECHNICAL CAPABILITIES I <br /> <br />RS&H has successfully developed an information technology infrastructure that not only <br />seamlessly integrates its own geographically dispersed and highly specialized <br />resources, including that of its clients, vendors, subcontractors and regulatory agencies <br />to create a virtual corporation that facilitates improved planning, design and construction <br />administration in less time with reduced rework because of timely, accurate <br />communication of project information to appropriate team members. <br /> <br />Software - All RS&H associates have access either through network or locally installed <br />applications to the tools that best support their work processes. For word processing <br />and spreadsheets needs the Windows Office Suite of products is used. <br /> <br />In CADD, Microstation, AutoCAD, AutoCAD Architectural Desktop, AutoCAD Land <br />Development Desktop with Civil, 3-D Studio Max, Path Planner and V-Ray software are <br />utilized for production documents. The Equorum Network Plotting System is used for all <br />corporate plotting. Engineering and analysis functions are supported by a host of <br />specialized applications such as Geopak, SWMM (Stormwater Management Model), <br />HEC-RAS (River Analysis System), AdlCPR (Advanced Interconnected Channel and <br />Pond Routing), ASAD (Storm Sewer Design Software), STAAD-III, DOE-2, etc. <br />Integrated office automation tools are provided through Microsoft Office. BST <br />Enterprise running on Windows Server supports project management, finance and <br />accounting operations and is accessible via the company's Intranet. <br /> <br />Project management is supported by a combination of Primavera SureTrak, Expedition, <br />and Microsoft Project. These tools are used both to manage projects for our clients and <br />to efficiently apply the highly diverse project delivery skills of over 800 associates in 28 <br />locations nation-wide and to assure that staff utilization and productivity remains high <br />and that project schedules, budgets and administrative requirements are met. <br /> <br />: QUALITY CONTROL <br /> <br />The RS&H Team is well aware of the potential for construction time extensions and cost <br />overruns as it relates to the quality of design and preparation of construction <br />documents. We are committed to providing the City with utmost quality engineering <br />services in order to satisfy the contractual requirements. Our project team will prepare <br />and adhere to a comprehensive Quality Control Plan (QCP) detailing the quality control <br />and quality assurance procedures to be used for the design and production activities. <br />The emphasis of the project's QCP is placed on the following two integral components: <br /> <br />IIS<< <br /> <br />,.,.ROVlNG YOUR WORLD <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.