My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RS&H
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-07-01) Prof. General Engineering
>
Responses
>
RS&H
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2011 1:30:15 PM
Creation date
2/18/2011 1:29:39 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
P.E.
Bid No. (xx-xx-xx)
07-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />..... <br /> <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />o <br /> <br /> <br />PROFESSIONAL GENERAL ENGINEERING CONSULTANT <br /> <br />RFQ # 07-07-01 <br /> <br />This process includes the RS&H QC Tracking Stamp for responsible party signatures <br />and corresponding dates. <br />Quality Assurance: The RS&H Team places a high priority on the Quality Assurance <br />process since it is essential to our continued success in the marketplace. All of the <br />project team members participating in this assignment will play an important and <br />integral role in carrying out our proposed Quality Control and Quality Assurance <br />program. The key elements of the plan include: <br />. Identification of the responsible project staff and the training of those staff <br />involved with the Quality Control process. <br />. Quality Control procedures including plans checking, calculations checking, <br />coordination, comment response verification and documentation, field reviews, <br />and constructability reviews. <br />. Quality Assurance measures and assessment involving the project manager and <br />project director. <br />· Regular progress meetings with Project Team to ensure proper coordination and <br />communication. <br /> <br />The RS&H Team will ensure that all design and production efforts are progressing <br />according to the project schedule and that all required Quality Assurance and Quality <br />Control reviews are being conducted and properly documented. The responsible <br />professionals and QAlQC Task Manager will certify that the Quality Control reviews <br />were performed by staff professionals to affirm its completeness, accuracy, quality, and <br />proper application of design criteria. This certification will also ensure that all comments <br />resulting from the reviews have been resolved and/or incorporated into the contract <br />documents. <br /> <br />I EXPERIENCE WITH REGULATORY AGENCIES AND CONSTRUCTION I <br /> <br />REGULATORY AGENCIES AND PERMITTING <br /> <br />The RS&H Team offers a number of qualified professionals with extensive experience <br />in the complex permitting process of the regulatory agencies. Preparing and submitting <br />thorough permit packages for a number of projects has helped establish relationships <br />with agencies such as Miami-Dade County Department of Environmental Resources <br />Management (DERM), South Florida Water Management District (SFWMD), the <br />Department of Environmental Protection (DEP), and the Miami-Dade Health <br />Department. <br /> <br />MANAGEMENT DURING CONSTRUCTION <br /> <br />During the construction phase, RS&H will provide competent staff with design and <br />construction expertise in the areas of construction administration and all construction- <br />related activities including, shop drawing review, contractor claim management (change <br />orders), supervision of the construction progress, final construction estimates, resolution <br />of field and office issues (RFl's), and monitoring the contractor's QC plan. <br /> <br />IIS&#I <br /> <br />,.,.ROVlNG YOUR WORLD <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.