My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
The Corradino Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-07-01) Prof. General Engineering
>
Responses
>
The Corradino Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2011 3:28:37 PM
Creation date
2/18/2011 3:22:13 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
p.e.
Bid No. (xx-xx-xx)
07-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />A <br /> <br />- <br /> <br />o <br />z <br />- <br />c <br /><( <br />0:: <br />0:: <br />o <br />U <br /> <br />John Sassine Construction Management/lnspectionfT esting - Hurricane <br />Recovery - Post Design Services - Bid Administration <br />John Sassine has more than 22 years of experience in South Florida in the field of Engineering <br />Design and Construction Management for multiple municipalities. Additionally, Mr. Sassine served <br />as Senior Project Administrator on many major projects with the Florida Department of <br />Transportation throughout South Florida; projects include the construction and permitting of many <br />water services supply, retention areas, drainage, storm retention basins, exfiltration drainage, deep <br />well, large pipe diameter pipe drainage system, channel excavation, turbidity control, and turbidity <br />testing and erosion control as required. Mr. Sassine was a leading Construction Manager during <br />hurricane Andrew clean up; he managed and monitored the cleaning efforts in Miami-Dade County <br />including SFWDM Canal along Old Cutler Road in Miami-Dade and throughout the affected area. <br />Mr. Sassine's leadership on 1-95 rehab of the corridor in Miami-Dade county thru construction and <br />complex traffic coordination, has proven to be very effective and rewarding to the community; also, <br />Mr. Sassine was involve in the reconstruction and rehab of 1-95 Corridor in West Palm Beach <br />County. He was awarded Bolton Award in District 4, for the 1-95 PGA Blvd project. Currently Mr. <br />Sassine is serving as Corradino's Senior Construction Division Manager and is working for several <br />relative to vertical and horizontal construction projects. Mr. Sassine communicates effectively and <br />has excellent people skills. He is responsible to assure compliance with designs contract procedures <br />and specifications are performed as required. <br /> <br />III <br />Cl <br />< <br />a. <br />
The URL can be used to link to this page
Your browser does not support the video tag.