My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Beiswenger, H & A
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-07-01) Prof. General Engineering
>
Responses
>
Beiswenger, H & A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2011 3:28:37 PM
Creation date
2/18/2011 3:28:37 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
p.e.
Bid No. (xx-xx-xx)
07-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br />. <br />. <br />- <br />. <br />- <br />. <br />. <br />. <br />. <br />. <br />- <br />. <br />. <br />. <br />. <br />. <br />- <br />. <br />I. <br />I <br />I- <br />. <br />- <br />. <br />. <br />. <br />. <br />. <br /> <br />,- <br />. <br /> <br />,- <br />.. <br />I <br />;. <br /> <br />d. Reference Project Name/Address: <br />Reference Project Description: <br />Scope of Services Provided: <br />Professional Fees: $1,003,50 <br />Construction Start Date: 3/2008 <br /> <br />State Road 816 (Oakland Park Boulevard) <br />Milling and Resurfacing from Powerline Road to Bayview Drive <br />Milling and resurfacing, signing, pavement marking, signal modification <br />Project Start Date: Jan.2004 Project Completion Date: June 2007 <br />Construction Completion Date: March 2009 <br /> <br />Estimated Construction Cost: $ 6,900,000 <br /> <br />Reference Company Name: FDOT District 4, Ronald <br />Wallace, PE, 954-777-4641, E- <br />mail: <br />ronald. wallace@dot.state.fl.us <br /> <br />The project entails milling and resurfacing of the existing pavement. <br />Addressing safety concerns and bringing other roadway and <br />structure features up to the current resurfacing, restoration and <br />rehabilitation (RRR) guidelines and standards. In addition, <br />landscaping enhancements will be developed along the corridor's <br />median. Furthermore, the existing span wire traffic signals located <br />at Andrews and NE 6th Avenue will be upgraded to mast arms. <br /> <br /> <br />e. Reference Project Name/Address: SR 25/0keechobee Road, Hialeah, FL <br /> <br />Reference Project Description: <br />Scope of Services Provided: <br />Professional Fees: $ 3,039,706 <br />Construction Start Date: 2004 <br /> <br />Roadway widening 4 to 6 lanes and bulkhead. <br />Final roadway, drainage and bulkhead design. <br />Project Start Date: 1995 Project Completion Date: 2004 <br />Construction Completion Date: 2006 <br /> <br />$ 48,000,000 <br /> <br />FDOT District 6, Luis Tellechea, 305-470-5471, Fax 305-470-6725, E- <br />mail: luis.tellechea@dot.state.fl.us <br /> <br />Engineering. Urban highway and drainage design. Open tunnel under <br />the Railroad crossing at Okeechobee Road Bulkhead along canal. <br />This urban roadway project located in the City of Hialeah, consisted of <br />1.5 miles of six-lane design from SR 826 to W. 1 ih Avenue. The <br />roadway design included drainage, lighting, signing and marking and <br />_ signalization. The drainage system consisted of continuous French <br />drain system. The depressed section being below the nearby Miami <br />Canal normal water level required the design .of triplex wet well <br />pumping station. <br /> <br />Project Construction Cost: <br />Reference Company Name: <br /> <br /> <br />f. <br /> <br />Reference Project Name/Address: <br /> <br />Reference Project Description: <br /> <br />Scope of Services Provided: <br /> <br />Professional Fees: $ 300,000 <br />Construction Start Date: 10/2005 <br />Project Construction Cost: <br />Reference Company Name: <br /> <br />NE 1st and NE 2nd Avenue from NE 5th Street to NE 11th Street in the City <br />of Miami <br /> <br />Milling and Resurfacing of NE 1st and NE 2nd Avenue from NE 5th Street <br />to NE 11 th Street. <br /> <br />Roadway design for milling and resurfacing, signing, pavement marking, <br />signal modification <br /> <br />Project Start Date: Aug.2002 Project Completion Date: June 2005 <br /> <br />Construction Completion Date: 2007 <br /> <br />$ 2,000,000 <br /> <br />Miami-Dade County, Leo ana, PE, 305-375-1909 <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.