My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Beiswenger, H & A
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-07-01) Prof. General Engineering
>
Responses
>
Beiswenger, H & A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2011 3:28:37 PM
Creation date
2/18/2011 3:28:37 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
p.e.
Bid No. (xx-xx-xx)
07-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />- <br />I <br />. <br />I <br />I- <br />.. <br />. <br />I. <br />. <br />. <br />. <br />. <br />. <br /> <br />was also included as a recommendation in the Study (see inset photo looking north along NW 3rd Avenue <br />from NW 8th Street). The total effort included traffic engineering studies, traffic signal timing, signing <br />pavement marking and signalization, highway design, traffic counts, and general civil engineering. We also <br />undertook an extensive Public Involvement effort that included more that fifty meetings with various <br />representatives of the project neighbors, businesses and community leaders, as many aspects of the project <br />was initially met with opposition from the local residents. <br /> <br />h. Reference Project Name/Address: <br />Reference Project Description: <br />Scope of Services Provided: <br />Professional Fees: $325,000 <br />Construction Start Date: 1/2006 <br />Estimated Construction Cost: <br />Reference Company Name: <br /> <br />SR-5/ Brickell Avenue, Miami-Dade County, FL <br />Roadway and Bridge Design <br />All Disciplines <br />Project Start Date: 8/2004 Project Completion Date: 8/2005 <br />Construction Completion Date: 10/2006 <br />$ 3,500,000 <br />FDOT District 6, Luis Tellechea, 305-470-5471, Fax 305-470-6725, E- <br />mail: luis.tellechea@dot.state.f1.us <br /> <br />This project in downtown Miami is the widening of SR 5 / Brickell Avenue to add an additional lane over the <br />Miami River. The work included roadway design, drainage, signing and marking, signalization. lighting and <br />bridge design. <br /> <br />A widening of the north approach span to accommodate an additional lane of traffic with modified AASHTO <br />Type VI beam designed by the LRFD Method. BHA prepared the Bridge Development Report, 30% Plans <br />and Final Plans. Also due to the close proximity of the construction of the Dupont Plaza Towers special <br />MSE walls and pier footings were detailed in order not to encroach into the right-of-way <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.