My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CPH
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-07-01) Prof. General Engineering
>
Responses
>
CPH
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2011 3:47:22 PM
Creation date
2/18/2011 3:47:22 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
P.E.
Bid No. (xx-xx-xx)
07-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~it~~~- ~- '~'.IC~ <br />?~P.rof~s~j~~al)WeRe];~l~~ngine~ring;G~~rfi~g, Se.~~ <br />'-';~.~-~~Ii'(({\ Q~ ~~~i'l4:~~' '\ ~~~~t:.N',t~..;_.~ <br />~~k~~i\'Fo~iT1ie-(ii!MPJjf!~unnM\Isl~s.!BellcJr .~>C~_ <br />,..L ..,"~ ~,tllL\I"'fJZ .- ..1"'" ~ I! - <br /> <br />S.R. 426 Utilit Relocation Pro'ect <br /> <br />Client: Oviedo <br /> <br />This project is being constructed in conjunction with the FOOT widening project of 1.2 miles of S.R. 426 and will be constructed <br />as a Joint Project Agreement (JPA). The project includes the relocation of the City's 10" watermain along S.R. 426 that will be in conflict <br />with FOOT's improvements. The existing 10" watermain was replaced with a 16" main along the project route which also included <br />reconnection of existing water services. In addition to the watermain relocations, an additional 12" watermain was designed to provide an <br />interconnect to another City owned watermain to improve reliably in the City's water system in this area. The City did not have wastewater <br />service in this area and the design included over 4,000 feet of a gravity sewer collection system with sewer lines ranging from 8" to 15". A <br />new master lift station was designed to accommodate the new wastewater service area as well as 1,300 feet of a 10" forcemain including a <br />270 foot directional drill under Red Bug Lake Road. This project also includes the abandonment and demolition of a wastewater treatment <br />facility and a temporary by-pass system to maintain wastewater service during construction. The construction documents met FDOT plan <br />preparation standards, FOOT roadway design schedules and where coordinated with the FOOT road design and other utilities. <br /> <br />Year Completed: 2007/Currentl Finishing Design <br /> <br />S.R. 528 Utilit Relocation Pro'ect <br /> <br />Orange Count , Florida <br /> <br />This project was initiated by Orange County Utilities (OCU) to relocate a 16" forcemain as a result of the bridge widening of SR 528 from 1-4 <br />to the Airport Toll Plaza. The widening of the SR 528 had the potential to impact lines owned and maintained by Orange County in Multiple <br />location. The challenges of this project included replacing the 16" forcemain with a new 30" forcemain within the John Young Parkway right- <br />of-way under the existing SR 528 bridge and have minimal disruption to the roadway and still maintain operation to the existing forcemain. <br />The project included two 54" jack and bores of 280 feet and 60 ft each, three 16" lines stops, two large thrust blocks, and 1,500 feet of 30" <br />forcemain. The construction documents meet FDOT and Turnpike plan preparation standards, FOOT roadway design schedule, and were <br />coordinated with the FDOT road design and other utilities. <br /> <br />Preliminarv En~dneerinQ <br />CPH prepared a study of relocation alternatives and solutions to provide continued utility service for the new forcemain. Both jack and bore <br />and directional boring installations were evaluated as possible construction techniques. Based on our study, it was determined that both <br />options were constructible but the jack and bore technique was more suited for this particular project. <br /> <br />PermittinQ Services <br />CPH was responsible for completing applications and obtaining permits from FOEP and Florida Turnpike Enterprises to allow for the <br />relocation of the forcemain. <br /> <br />Final Desian Services <br />CPH provided the final construction drawings and technical specifications for the relocated force main on schedule within CPH's contract <br />amount. CPH also successfully assisted OCU with Bidder evaluations and made recommendations for the subsequent award of the project <br /> <br />Construction Services <br />CPH provided general construction services during the installation of the forcemain including general observation of the construction, shop <br />drawings, and RFl's. <br /> <br />Contract Dates: 2005 <br /> <br />Contact Person: Jose Hernandez (Oran e Count ) <br /> <br />. . . 'I l' . II <br /> <br />Engineers . 5wveyors . Atthitects . Planners . Landscape Architects . Environmental Sdentislll . Consbuction Management . DesigrYBuild Quality & Innovation I <br />For Design & Construction <br />
The URL can be used to link to this page
Your browser does not support the video tag.