<br />f:,p:r~Ji~<i~;l!a!l!Etigi~e~rin~~ft'gs;~~
<br />'-'...,.4Jt;-~'~lm (~~~\\ t\~~:'wG'? '\ ~.~~t"'''~~~~~
<br />r;..~.;~tl.'For,,:T1ie (ii$Yliift~~unnM\IsI~s.!B'etlEJr'~
<br />'LLS .."..\\ ~~~(tltL\I!J[)' " / .Y ~!! --
<br />
<br />USTA Florida Headquarters Daytona Beach Tennis Center
<br />
<br />CPH Engineers, Inc. was awarded a contract by the City of Daytona Beach for a Design,Build project for the United States Tennis Association. CPH
<br />served as the Owner's Professional Engineer and General Contractor for design and construction of the City of Daytona Beach Tennis Center, City
<br />Contract Number 2000,48. The project includes the following: 12 Pair of Lee HydroCourt Rock Pipe Fast,Dry Tennis Courts including curb, base,
<br />irrigation systems, net posts, nets, center anchors, center straps, 10' fencing as shown on the Site Plan, and Hydro blend Fast-Dry surface and
<br />playing lines, lighting 75 Avg. F.C. for twelve courts, Shade Areas Twelve each including a double bench, fountain, and canvas shade structure, a
<br />6,000 square feet and two,story Tennis Center, a grandstand/deck for 500 seats, a 300 square feet maintenance building.
<br />
<br />Daytona Beach, Florida
<br />
<br />Tuskawilla Towne Center (Streetscape, Fountains and Trails)
<br />
<br />Site Work included: clearing/grubbing 14 acres, filling for site by Owner, paved parking, parking/site lighting, onsite utilities, stormwater facilities,
<br />landscape/irrigation per City Code, walk,ways, and an entrance road ancj deceleration lane.
<br />
<br />The Winter Springs Town Center Trail is a pedestrian trail that will connect the cross state Trail with the Winter Springs Town Center.
<br />The twelve foot trail is centered in the Blumberg Avenue median and terminates at the magnolia square fountain. The trail was designed
<br />as a walk through a French Provincial Garden. A series of garden rooms were created, highlighted by garden pavilions, classical
<br />pergolas and a welcoming fountain at the north entrance to the corridor. Landscaping is designed to be colorful and lush, with stately
<br />Sylvester Palms guiding your way along the Trail. Concrete pavers were use for surfacing. Patterns change as you enter into the street
<br />or into a new garden space. CPH Services included hardscape design, fountain design, civil design and landscaping and irrigation.
<br />
<br />Winter S rin 5, FL
<br />
<br />Sprin Hill Park
<br />
<br />Volusia County, Fl
<br />
<br />CPH provided preliminary engineering and site planning along with construction estimates and landscape architecture services for the expansion of
<br />Spring Hill Park. Assistance was provided in public presentations and community meetings.
<br />
<br />The final product will consist of phased construction plans with final engineering
<br />. Basketball court
<br />. Restroom facility
<br />. Tot lot
<br />. Pavilion
<br />. Expansion of an existing walkipg tr~I1to encompass the additig,nql park area.
<br />
<br />lake Monroe Trail
<br />
<br />CPH provided services for a multi-purpose trail approximately two miles in length that winds through wetlands, wooded uplands and open pasture land.
<br />CPH prepared designs of elevated wooden boardwalks to reduce the impact to existing wetlands. The project included coordination and permitting
<br />with the Water Manage!}1ent District as well a~ the Division of Historical Resources.
<br />
<br />Volusia County, Fl
<br />
<br />First Street Streetscape Project
<br />
<br />CpR is currently contracted with the City of Sanford io provide a streetscape design package for a 6 block section of historic F1rsi Street, downtown.
<br />The intent of this project is to closely match the streetscape of improvements previously completed on First Street. Close coordination with other
<br />design firms involved in adjacent projects is of utmost importance as we provide seamless transition from one phase to another. Plans and services
<br />include the conceptual and final design of a Gateway feature introducing the historic district. CPH is working with the city of Sanford to develop a
<br />theme for this gateway to showcase the style and character unique to this historic area and incorporate the cities logo. As an integral element to this
<br />design a strong emphasis will be placed on planting design. CPH is conducting design charettes to ensure input and direction from city officials and
<br />other interested parties. This gateway is at the intersection of First Street and 17-92.
<br />
<br />Sanford, Fl
<br />
<br />CPH is developing up to three conceptual streetscape plans based on site survey data, review of phase one drawings, field observations and
<br />interviews with city staff. The concepts will depict proposed improvements such as landscape bulb-outs at intersections, planter and street tree
<br />spacing, implications to on-street parking, and paver layout. These designs will be presented to the city and the community for review and input. The
<br />final package will include sidewalk and street curb layout, planting and paver design, parking layout, irrigation plans, lighting and electrical plan, site
<br />furniture selection and layout, streetscape details and the gateway entrance details.
<br />
<br />Engineers . Surveyors . Architects . Planners . Landscape Architects . Environmental Scientists . Construction Management . DesigrVBuild Quality & Innovation I
<br />For Design & Construction
<br />
|