My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CMF
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-07-02) General Architectural Services
>
Responses
>
CMF
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2011 1:26:02 PM
Creation date
2/23/2011 1:25:50 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. General Architectural Svcs.
Bid No. (xx-xx-xx)
07-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />o <br /> <br />o <br /> <br />c <br /> <br />ee eMF <br /> <br />INTERNATIONAL GROUP. INC <br /> <br />Other projects that required extensive structural renovations include the Brolam Warehouse, a storm <br />damaged building by Hurricane Wilma required immediate attention. A design/build approach allowed the <br />project to be fast tracked. The damage was extensively and the building had to be vacated. The building <br />structure had to be reinforced and at the same time updating the structure to comply with the Florida <br />Building Code. Elevator and entry ramp had to be added in order to comply with the Accessibility Code. <br />The Building was just completed this month. <br /> <br />Other projects included the Sevilla Office Building in Coral Gables and Chispa Restaurant at Doral, for The <br />Astri Group, a private development group located in Coral Gables, Florida. CMF was retained to provide <br />Project Management Services for both projects as the Owners' Representative, managing a total program <br />cost of $ 8,978,000.00 for both projects. <br /> <br />CMF is also providing Construction Management for Bird Road Starbucks Shopping Center, now in <br />progress. This shopping center has over 10,200 square feet of retail space that will house national franchise <br />such as Starbucks Coffee, Mattress Firm and Quiznos. CMF will be responsible for all permitting aspects <br />of the project and the coordination for all trades. Including the coordination of the lift station and force <br />main that extends % of a mile, requiring the interaction with FDOT and W ASD. <br /> <br />CMF has a team of proven professional that provides the experience and the depth that the City of Sunny <br />Isles Beach is seeking. Our group is proud of its exceptional Quality of Services and our willingness to <br />work to obtain the best solution to our client needs. We at CMF look forward in working with the City of <br />Sunny Isles Beach, uld like the opportunity of presenting our qualification in person. <br /> <br /> <br />C s M. Flores, AlA, CGc. <br />resident <br /> <br />Cc: File <br /> <br />Architecture - Interior Design - Program Management - Construction Management - AA-2600075 <br />9300 South Dadeland Blvd. Suite 602 -Miami, FL 33156 - Office: 305670-1499 - Fax: 305 670-1495 - info@cmfintlqrouD.com <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.