My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CMF
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-07-02) General Architectural Services
>
Responses
>
CMF
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2011 1:26:02 PM
Creation date
2/23/2011 1:25:50 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. General Architectural Svcs.
Bid No. (xx-xx-xx)
07-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />eelGMF _ <br /> <br />INTERNATIONAL GROUP, INC. <br /> <br />BROLAM WAREHOUSE STORM DAMAGE <br />ORE-CONSTRUCTION <br /> <br />Carlos M Flores. A/A. NCARB <br />Design / Build Services <br /> <br />Start Date: <br />December 2005 <br /> <br /> <br />Location: <br />Hialeah Gardens, Florida <br /> <br />Services Provided: <br />Architect of Record & <br />Construction Management <br /> <br />Completion Date: <br />August 2007 <br /> <br />o <br /> <br />Total Construction Cost: <br />$ 2,219,000.00 <br /> <br /> <br />Total Structure Square <br />Footage: <br />37,597 sq. ft. <br /> <br />Descriotion of the Project: A 37,597 sq. ft. warehouse with 8356 sq. ft. of offices area with 2 loading dock areas <br />and the site is 2.43 acres. The Building was damaged by Hurricane Wilma. The storm blew off the west loading dock <br />canopy (25'x63') and rolled over the warehouse structure peeling the roofing system of the main warehouse and <br />creating extensive damage to the structure and the office interior of the building. The building had additional damage <br />to the roof metal deck due to old age. The building needed to be brought up to the current code requirements and <br />provide accessibility. <br /> <br />o <br /> <br />Technical Duties: CMF was retained as Architect of Record and Construction Management to provide design /build <br />services for the re-construction of the warehouse and office area. CMF prepared plans and specifications for the <br />rebuilding of the canopy steel structure, replacing of the entire steel deck to the structure. Providing a light weight <br />insulating concrete system, and re-roofing the entire building. As well as the interior build-out of the office area and <br />adding a new entrance feature with handicap ramp and the new elevator tower to the building. The building was <br />upgraded as per Florida building code 2004. A schedule and a cost estimate was prepared prior to signing the contract <br />and cost verification is on going during the construction of the project. The cost of the project was $2,219,000. <br />dollars. The design phase was completed in June 2006. The project is under construction and the construction phase <br />is expected to be completed by August 2007. <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.