My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CMF
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-07-02) General Architectural Services
>
Responses
>
CMF
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2011 1:26:02 PM
Creation date
2/23/2011 1:25:50 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. General Architectural Svcs.
Bid No. (xx-xx-xx)
07-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ee C~F <br /> <br />INTERNATIONAL GROUP. INC. <br /> <br />BIRD ROAD STARBUCKS <br />o SHOPPING CENTER <br /> <br />Carlos M Flores. AlA. NCARB <br />Consultant-Construction Management <br /> <br />Location: <br />Miami, Florida <br /> <br />Services Provided: <br />Construction Management <br /> <br />Total Structure Square <br />Footage: <br />10,247.71 Sq. Ft. <br /> <br /> <br />.-< <br /> <br />Start Date: <br />July 2007 <br /> <br />Completion Date: <br />February 2008 <br /> <br />. <br /> <br />Total Construction Cost: <br />$2,300,000.00 <br /> <br />Descriotion of the Proiect: The Bird Road Starbucks Shopping Center is a single story structure with two <br />buildings for a total area of 10,247.71 square feet of retail space and a total site area of 31,300 Square feet. This <br />includes parking for 61 spaces, with access to Bird Road and 83rd A venue. This shopping center will house national <br />franchise such as Starbucks Coffee, Mattress Firm and Quiznos. <br /> <br />This building structure will consists of masonry walls, steel joist and light weight concrete roof structure, with steel <br />columns and frames for the impact glass store front windows system. The site work will include all the site drainage, <br />site lighting and landscaping as well as a lift station and force main that extends % of a mile, requiring the interaction <br />with FDOT and W ASD. <br /> <br />Technical Duties: <br />CMF INTERNATIONAL GROUP, INC. was selected to be the Construction Manager for The Bird Road Starbucks <br />Shopping Center, responsible for the construction implementation and timely delivery of the project. CMF will be <br />responsible for all permitting aspects of the project and the coordination for all trades, including the coordination of <br />the lift station and force main implementation. The project started in August 2007 and is expected to be completed in <br />February of2008. The Construction Cost is estimated to be $ 2.3 Millions. <br /> <br />\) <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.