My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CMF
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-07-02) General Architectural Services
>
Responses
>
CMF
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2011 1:26:02 PM
Creation date
2/23/2011 1:25:50 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. General Architectural Svcs.
Bid No. (xx-xx-xx)
07-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />o <br /> <br />() <br /> <br />c <br /> <br />ee.CMr: -; <br /> <br />INTERNATIONAL GROUP, INC. <br /> <br />SOUTHRIDGE COMMUNITY & AQUATIC CENTER <br /> <br />Carlos M Flores, AlA. NCARB <br />Consultant-Construction Management <br /> <br />Location: <br />Miami, Florida <br /> <br /> <br />Services Provided: <br />Architecture <br />Construction Management <br /> <br />Completion Date: <br />October 2006 <br /> <br />Total Structure Square <br />Footage: <br />13,369 <br /> <br />Total Construction Cost: <br />$ 5,301,231.00 <br /> <br /> <br />Technical Duties: <br /> <br />Architecture Construction Management. Southridge Community & Aquatic Center, Miami, FL. CMF was selected <br />to provide Architectural Construction Management as a sub-consultant to C3TS for a community and aquatic <br />center for Miami-Dade County, Department of Parks and Recreation. The total structure is 13, 369 sq. ft. that <br />include the community center bldg, restrooms, aquatic center, covered outdoor seating area, exterior and covered <br />breezeway. The pool area totals 11,977 sq. that includes a children's water play pool, a teaching pool, and a <br />competition pool. <br /> <br />Mr. Flores is to oversee the cost estimating and scheduling for the project, assist in the bid analysis of the project, <br />and oversee the construction administration for the project, including the application for payment review and <br />certification and the change order review. The Cost Estimate at 100% CD for the project is $ 5,301,231.Dollars. <br /> <br />The design phase was completed in October of 2006. The project is under review by the department prior to going <br />out for Bids. <br /> <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.