Laserfiche WebLink
<br />eel'Ci:lF- ~) <br /> <br />INTERNATIONAL GROUP, INC. <br /> <br />UTILITIES MASTER PLAN <br />o HOMESTEAD AIR RESERVE PARK <br /> <br />Carlos M Flores, AlA. NCARB <br />Sr. Project Manager / Designer IE <br /> <br />Location: <br />Homestead, Florida <br /> <br /> <br />Services Provided: <br />Master Plan Development <br />& Design <br /> <br />Start Date: <br />2000 <br /> <br />Com pletion Date: <br />2004 <br /> <br />Total Construction Cost: <br />$ 23,000,000.00 <br /> <br />o <br /> <br />Description of Work: Architectural/Engineering Services for a regional park. The scope of services included the <br />utilities master plan for the park, the scope verification of the master plan as it related to all utility requirement, the <br />planning and design of all incoming utilities to the site and the impact the park would cause on the existing <br />surrounding utilities. The scope also required resolving issues that would impact future growth of the park and its <br />surrounding community. The scope of services included the design of Recreation Field Center, multiple soccer fields <br />with bleachers, multiple baseball fields, fields to include lighting and irrigation, picnic shelters, restrooms/storage <br />building, three parking lots with 268 parking spaces in total, and pathways. <br /> <br />Technical Duties: Senior Project Manager responsible for site planning and coordination with civil all engineering <br />tears or all utilities location and coordination of all future needs for the park. Preparation of design criteria for the <br />documents and coordination with all engineering tears. Started 2000-Completed 2003. Senior Project Manager <br />responsible for: site planning and coordination with civil engineering for all traffic constraints. Designing all <br />amenities building structures as well as Designing the Taxi Cab Cafeteria; overseeing the preparation of construction <br />documents and coordination with all engineering tears; and providing construction administration overview of the <br />project. The construction cost of Phase I for this project was estimated to be $ 575,000.00, with the overall <br />construction cost for all Phases at $ 3,200,000 dollars. <br /> <br />o <br /> <br />9 <br />