My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bermello, Ajamil & Partners
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-07-02) General Architectural Services
>
Responses
>
Bermello, Ajamil & Partners
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2011 3:26:28 PM
Creation date
2/23/2011 3:26:01 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. General Architectural Svcs.
Bid No. (xx-xx-xx)
07-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br />. <br />. <br />. <br />'. <br />I. <br />. <br />e <br />. <br />. <br />. <br />'. <br />I. <br />. <br />. <br />,. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />Leonardo Rodriguez, PE <br />Civil Engineer <br /> <br />Matheson Hammocks Master Plan - Senior Civil Engineer responsible for the paving, grading and <br />drainage and utility infrastructure improvement due diligence associated with this Miami-Dade <br />County Parks and Recreation Department park abutting Biscayne Bay, A boundary and topograph- <br />ic survey as well as geotechnical testing was coordinated and utilized to evaluate the effectiveness <br />of the existing water management and drainage system associated with open green recreational <br />areas, parking designated areas, marinas abutting the Itracoastal Water Way and areas landward <br />of the existing dune line along the beach, Also evaluated the service level of the existing water dis- <br />tribution and sanitary sewage collection and transmission system, A comprehensive facilities report <br />was developed that identified deficiencies to existing systems and recommended improvements <br />to the water management and drainage system, the water distribution system and the sanitary <br />sewage collection and transmission system, Close coordination with the Florida Department of Envi- <br />ronmental Protection (DEP), the Miami-Dade County Department of Environmental Resources Man- <br />agement (DERM) was maintained throughout the master plan process, <br /> <br />Jerry Curtis Park Improvements . Senior Civil Engineer in charge of the water management and <br />drainage improvements for this City of Miami park abutting the Miami River, Boulder rip-rap shore- <br />line stabilization was designed to protect the existing bank of the river abutting the park and a new <br />pedestrian promenade along the river was designed, New site grading and drainage providing <br />one inch of water quality with a control structure and exfiltration trench was designed along with a <br />positive outfall pipe discharging to the river, Sustainable design was implemented through the use <br />of swales, water quality treatment components and stabilization of the river bank, An environmen- <br />tal resource permit IERP) from the Florida Department of Environmental Protection IDEP). a dredge <br />and fill permit from the US Army Corp of Engineers and a Class I coastal construction permit from the <br />Miami-Dade County Department of Environmental Resources Management IDERM) was processed <br />and obtained, <br /> <br />City of Dania Comprehensive Drainage Plan - Prepared a comprehensive plan of the City's drain- <br />age system, Utilized existing surveys to identify drainage basins, calculated the storage capacity <br />of each basin, evaluated the storm water collection system within each basin, recommended im- <br />provements for each basin and divided the improvements into small stand alone projects to assist <br />the City in priorifizing the work based on the available funds, Also assisted the City in developing a <br />special storm water drainage assessment to acquire additional revenues to implement storm water <br />system improvements, Presented the results to the City Commission, (Project engineer) <br /> <br />Margaret Pace Park Shoreline Stabilization - This project entailed the design of boulder rip-rap <br />beach line stabilization for this City of Miami public park abutting Biscayne Bay, The work included <br />coordination with the surveyors, the City of Miami C1P Department, the Florida Department of Envi- <br />ronmental Protection (DEP). the US Army Corp of Engineers (COE) and the US Coast Guard, Design, <br />permitting and construction phase service were provided, (Project Manager) <br /> <br />CPHI Sanitary Pumping Station - Senior Civil Engineer, Design of a Miami-Dade Water and Sewer <br />Department (MDWASD) donation sanitary pumping station with emergency generator, The project <br />required the design of a sanitary force main with a hot tap of reinforced concrete cylinder pipe <br />force main, <br /> <br />Bel Aire Drainage Improvements - Senior Civil Engineer, Designed the water quality and drainage <br />improvements for approximately four miles of roadway for the Miami-Dade County Department En- <br />vironmental Resources Management (DERM), Work entailed the design of an interconnected hybrid <br />exfiltration trench - positive outfall system, <br /> <br />Country Walk Drainage Improvements - Project Manager, Designed the water quality and drain- <br />age improvements for approximately two miles of roadway for the Miami-Dade County Department <br />Environmental Resources Management (DERM), The work entailed the design of an interconnected <br />hybrid exfiltration trench - positive outfall system discharging to a County Canal. <br /> <br />CPa <br /> <br />11 <br />~ www.bermelloajamil.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.