Laserfiche WebLink
<br />I: <br />i. <br />. <br />'. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />,. <br />. <br />I. <br />I. <br />.. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />Leonardo Rodriguez, PE <br />Civil Engineer <br /> <br />Meadow Wood Cedar Creek Drainage improvements - Project Manager, Designed the water qual- <br />ity. and drainage improvements for approximately six miles of raodway for. the Miami-Dade County <br />Department Environmental Resources Management (DERM), The work entailed the design of an <br />interconnected hybrid exfiltration trench - positive outfall system discharging to a County Canal <br />through various control structures, <br /> <br />Atias Air Facility Drainage Analysis - Senior Civil Engineer, Prepared a peer review of the drainage <br />system proposed for this facility, Analysis of the water management and drainage system focused <br />on the potential impacts this project may have on Aviation Department adjacent properties, <br /> <br />Homestead Air Reserve Base Phase Infrastructure Improvements - Senior Civil Engineer, Entailed the <br />planning and modeling of a manifolded sanitary pumping station and force main system to serve <br />the Military as well as future development of the Base, Two MDWSD donation sanitary pumping <br />stations with emergency generators were designed along with force main and associated gravity <br />sanitary sewer, <br /> <br />City of Miami Pavement Rehabilitation - Project Manager, Full reconstruction and resurfacing of City <br />roads, Drainage improvements were designed where needed, Design, permitting and construction <br />phase services were provided, <br /> <br />NW 22nd Water Quality Improvements - Project Manager, Analysis of the existing reinforced <br />concrete pipe positive outfall system from Alibaba A venue to the Comfort Canal in the City of <br />Opa-Locka, Two diversion control structures divert storm water runoff from the existing system to <br />the proposed exfiltration trench providing the necessary water quality and divert runoff back to the <br />existing system, <br /> <br />Brownsville Middle School - Project Manager. Provided design, permitting and construction phase <br />services for this Miami-Dade County Public School (MDCPS) design-build project. Entailed the coor- <br />dination of right-of-way dedication, utility power pOle relocation, drainage improvements, potable <br />water and sanitary sewer improvements as well as pavement marking and signage associated with <br />the addition of two buildings and parking facilities, <br /> <br />Cutler Cay - Project Manager, Civil Engineering infrastructure improvements associated with a 250- <br />acre land development located on coastal wetlands abutting Biscayne Bay, Water management <br />and drainage system consists of a 30-acre lake and a hybrid exfiltration trench, Coordinated efforts <br />of biologist and spearheaded permitting efforts, <br /> <br />Bellagio - Project Manager, Prepared a civil engineering infrastructure due diligence analysis to <br />determine the economic viability of 65-acre project. Prepared an opinion of probable construction <br />cost for the off-site roadway improvements, the potable water and sanitary force main extensions <br />along public right-of-way, on site water distribution and sanitary sewage collection and transmission, <br />Represented client at meetings, <br /> <br />Fontainebleau East and West - Project Manager, Assisted client in the site plan approval process <br />and various public hearings to develop a site plan for this 135-acre land development project on <br />the site of a former golf course, Directed the water management study to size lakes and maximize <br />the waterfront buildable area for the client, Also directed the design of the water distribution system <br />and sanitary sewage collection, <br /> <br />Blue Lagoon Lake FiII- Project Manager, Coordinated all the work with developers and the architect <br />to prepare a preliminary site plan for a high rise building within a nine acre fill pad, Directed the <br />preparation of reclamation plans to fill nine acres of Blue Lagoon and processed the associated <br />Environmental Resource Permit (ERP) through all associated agencies, <br /> <br />Q)a <br /> <br />12 <br />)- www.bermelloajomil.com <br />