My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Tim Haahs Engineers
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-08-01) Prof. Design Svcs. for Heritage Park and Parking Garage
>
Responses
>
Tim Haahs Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2011 3:50:47 PM
Creation date
2/28/2011 3:44:14 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Design Svcs. for Heritage Park & Pkg Garage
Bid No. (xx-xx-xx)
07-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br /> <br />I <br /> <br />12. NAME <br />E. James Ebert, P.E. <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each kev oerson. ) <br />13. ROLE IN THIS CONTRACT <br />Project Manager <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL I b. WITH CURRENT FIRM <br />24 13 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />Timothy Haahs & Associates, Inc., Miami, FL <br /> <br />16. EDUCATION (DEGREE AND SPECIALlZA TION) <br />BS / Engineering <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />DE / Professional Engineer <br />FL/ MI / OH / PA <br /> <br />I <br /> <br />I <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations, Training, Awards, etc.) <br />Florida Parking Association, Board Member <br /> <br />19. RELEVANT PROJECTS <br /> <br />I <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Miami Courthouse Garage PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Miami, FL 2007 2008 <br />a. (3) BRIEF DESCRIPTION (Briel scope. size, cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Principal. The Miami Parking Authority is constructing a state-of-the-art multi-million dollar facility adjacent to the new Federal <br /> Courthouse in downtown Miami. TimHaahs is currently serving as the prime designer, providing full architectural and parking <br /> design services for this significant new facility. TimHaahs designed the 700 space facility for a future horizontal expansion that <br /> would add 300 additional parking spaces. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> City of Naples Public Parking Facility - Naples, FL PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Naples, FL 1999 1999 <br />b. (3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Principal. The City of Naples Fourth Avenue South and Eighth Street South Parking Facility opened in the summer of 1999. The <br /> parking structure provided much needed parking for employees and customers of the exclusive Fifth Avenue South shopping <br /> area in addition to supporting the Naples Players Theater located directly adjacent to the facility. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Naples 8th Street Garage PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Naples, FL 2007 2009 <br />c. (3) BRIEF DESCRIPTION (Briefscope, size, cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Principal. TimHaahs is currently designing a second garage for the City of Naples, located just one block south of the <br /> fashionable 5th Ave. South Shopping district. The garage will have a capacity of approximately 325 cars, and will incorporate <br /> extensive planters and trellises similar to the existing garage at 4th Ave. S. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> City Park Mall Aesthetic Improvements PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Fort Lauderdale, FL 2007 2008 <br />d. (3) BRIEF DESCRIPTION (Brie/scope. SIZe, cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Principal. The City Park garage is a 2,000 space facility located in the downtown district. TimHaahs is performing professional <br /> engineering and architectural services for the Phase III Aesthetic Improvements to the City Park Garage in Fort Lauderdale. <br /> TimHaahs is updating and enhancing the architectural aesthetics of the facility and improving the functionality of the garage. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Florida International University Conceptual Site Plan PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Miami, FL 2006 2007 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br />e. Principal. Project Manager. Timothy Haahs & Associates, Inc. (TimHaahs) developed a masterplan/ conceptual site plans for <br /> two mixed-use developments at the University. These sites are critical to support the University's growth and transform it from <br /> a commuter campus to a campus where students live, learn, play, and work. The stadium site includes two 2000 car parking <br /> structures, student housing, and classrooms; it also creates a student quad between the existing football stadium and <br /> performing arts center. The 8th Street site includes a new 2000 car parking structure and retail. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />STANDARD FORM 330 (1/2004) PAGE 2 <br /> <br />I <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.