|
<br />'.
<br />I.
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FORTHIS CONTRACT (COMPLETE ONE SECTION E FOR EACH KEY PERSON)
<br />
<br />I
<br />
<br />12 NAME
<br />Karl Stumpf AlA, COT; CSI, LEED@
<br />
<br />13 ROLE IN THIS CONTRACT
<br />Principal-in-Charge
<br />
<br />14 YEARS EXPERIENCE
<br />a. fOTAL 17 b WITH CURRENT FIRM 15
<br />
<br />15 FIRM NAME AND LOCATION lCitv and SlaIel
<br />RTKL Associates Inc., Washington, DC
<br />
<br />I
<br />
<br />16 EDUCATION (Degree and SpeCializatIOn)
<br />Bachelor of Architecture, Louisiana State University
<br />Master of Architecture, Historic Preservation, University of Illinois
<br />
<br />17 CURRENT PROFESSIONAL REGISTRATION (State and
<br />Dlsclplme)
<br />Registered Architect: AR,CA,DC,GA,FL,MA,MD,
<br />NC,NJ,NV,NY,OH,PA,TX,VA, LEED@, NCARB
<br />Construction Documents Technologist
<br />
<br />I
<br />
<br />I
<br />
<br />18 OTHER PROFESSIONAL OUALlFICATIONS (PublicatIOns, Organizations, Trammg, Awards, etc)
<br />Karl Sturnpf is Director of the workplace sector and RTKLs Preservation Studio, which focuses on preservation, restoration,
<br />modernization and adaptive use projects. His portfolio of workplace, government, institutional and hospitality projects reflects
<br />professional experience and academic training in historic preservation. He is also a a leader in the integration of sustainable
<br />concepts into modernization and preservation projects. Karl joined RTKL in 1992 and was promoted to Vice President in 200t
<br />
<br />19. RELEVANT PROJECTS
<br />
<br />I
<br />
<br /> (1) TITLE AND LOCATION (CltV and State) [X] Performed with 121 YEAR COMPLETED
<br /> Georgetown University, Multiple Projects, Washington, DC current firm
<br /> 131 BRIEF DESCRIPTION (Bnet scope. SIZe, cosr, etc.!AND SPECIFIC ROLE PROFESSIONAL
<br /> Role: Principal-in-Charge Size: Varies Cost: Varies SERVICES
<br />a Varies
<br /> RTKL continues to enjoy a long-lasting relationship with the University of Georgetown located in
<br /> Washington DC. The capstone projects of this relationship include the McDonough School of Business and CONSTRUCTION IIf
<br /> the University Medical Center. Applicable)
<br /> Varies
<br /> 11) TITLE AND LOCATION lCitv and State) [X] Performed with (21 YEAR COMPLETED
<br /> Bancroft Hall Rehabilitation, U.S. Naval Academy, Annapolis, Maryland current firm
<br /> 131 BRIEF DESCRIPTION (Bnef scope SIN cost, etc.) AND SPECIFIC ROLE PROFESSIONAL
<br />b Role: Principal-in-Charge Size: 140,000,000 SF Cost: $ 230,000,000 SERVICES
<br /> Project consisted of developing renovation master plan for rnassive phased 10-year renovation. Each phase 2008
<br /> addressed three primary concerns: accommodating future technological and educational developrnents; CONSTRUCTION (If
<br /> designing in concert with the cornplex's historic nature; and minimizing disruption to ongoing activities. Applicablel
<br /> 2008
<br /> 111 TITLE AND LOCATION (Citv and Statel [X] Performed with 12)YEAR COMPLETED
<br /> King Hall, U,S. Naval Academy, Annapolis, Maryland current firm
<br /> 131 BRIEF DESCRIPTION IBnef scope, Size, cost, etc.! AND SPECIFIC ROLE PROFESSIONAL
<br /> Role: Principal-in-Charge Size: 55,000 SF Cost: SERVICES
<br />c.
<br /> RTKL was comissioned to perforrn a renovation to recapture the spirit of the original and historic "flagg" 2008
<br /> plan by reintroducing a formal plaza space on the axis that connects Smoke Hall via Smoke Park to the CONSTRUCTION Ilf
<br /> waters edge, The plaza is located at the intersection of the original King Hall and its addition, subdividing it Applicable)
<br /> into three phases. 2008
<br /> 111 TITLE AND LOCATION lCitvand Srate) [X] Performed with (2) YEAR COMPLETED
<br /> Preble Hall, U.S. Naval Academy, Annapolis, Maryland current firm
<br /> 13) BRIEF DESCRIPTION (Bnel scooe. Size, COSt. ete.! AND SPECIFIC ROLE PROFESSIONAL
<br />d Role: Principal-in-Charge Size: 100,000 SF Cost: $ 17,600,000 SERVICES
<br /> Preble Hall is the U.S, Naval Academy Museum, approximately 100,000 SF in area, with a collection of over 2009
<br /> 65,000 artifacts including an extensive collection of ship models. Design scope includes base building and CONSTRUCTION IIf
<br /> exhibit design, with a design-to budget of $17.6M + ($1O.6M for building, $7M, Applicable)
<br /> 2009
<br /> (1) TITLE AND LOCATION (Citvand State) [X] Performed With 121 YEAR COMPLETED
<br /> U.S. Capitol Visitor Center, Washington, DC curtent firm
<br /> 131 BRIEF DESCRIPTION (Bnef scope, Size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL
<br />e Role: Principal-in-Charge Size: 580,000 SF Cost: Confidential SERVICES
<br /> The new design plan for the visitor center will enhance visitor reception facilities and strengthen the 2008
<br /> building's security while preserving a general atmosphere of free public access to the more than 3 million CONSTRUCTION Ilf
<br /> visitors who visit annually. Designed to accommodate approximately 4,500 visitors, the facility is located Applicable)
<br /> under the East Plaza. 2008
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
|