|
<br />I
<br />'I
<br />'.
<br />I.
<br />I
<br />I
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FORTHIS CONTRACT (COMPLETE ONE SECTION E FOR EACH KEY PERSON)
<br />
<br />12. NAME
<br />
<br />13. ROLE IN THIS CONTRACT
<br />
<br />Victor Rodriguez NCARB
<br />
<br />Technical Architecture
<br />
<br />14. YEARS EXPERIENCE
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />
<br />a, Total 19
<br />
<br />b, With Current Firm 2
<br />
<br />RTKLAssociates Inc., Miami, FL
<br />
<br />16. EDUCATION (Degree and SpecializatIOn)
<br />
<br />BACHELOR OF ARCHITECTURE, UNIVERSIDAD DOMINICANA. 1988
<br />
<br />17 CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />
<br />I
<br />
<br />18. CURRENT PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etcl
<br />Victor Rodriguez has 18 years experience in design, supervision and construction management and administration, including high-rise residential,
<br />institutional, retail stores, hospitality, residential and commercial buildings, He has a strong knowledge of construction methods and structural sys-
<br />tems. Detail and team oriented, Mr. Rodriguez is able to provide leadership and support under work pressure.
<br />19, RELEVANT PROJECTS
<br />
<br />I
<br />
<br />a (1) TITLE AND LOCATION IClty and Statel (21 YEAR COM PLETED
<br /> Wilkie D. Ferguson Jr, Federal Courthouse, Miami. FL . Fill if prolect performed with current flnn PROFESSIONAL SERVICES
<br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc) AND SPECIFIC ROLE 2006
<br /> ROLE: Project Manager SIZE: 557,000 SF COST: $127 million CONSTRUCTION
<br /> The project includes 16 district courtrooms and chambers along with space for the Clerk of the Court,Grand Jury Suites. Pre-trial 2007
<br /> Services, the U.S. Marshals Service office. Marshal Service sally port with secure corridors and detention cells; automated data process-
<br /> ing area for probation. the U.S. Attorney and GSA Operational/Joint Use space for conference/training rooms; loading dock, trash and
<br /> recycling rooms, mail room, dock office, security/fire life safety office, and storage space. The project will include a tunnel connector to
<br /> link the proposed new courthouse with the existing Federal Court complex.
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />b 11) TITLE AND LOCATION (City and Statel (2) YEAR COMPLETED
<br /> Miami International Airport Terminal / D-E-F Wrap, Miami. FL o Fill if project performed With current firm
<br /> PROFESSIONAL SERVICES
<br /> 13) BRIEF DESCRIPTION (Bnef scope size, cost, etc.) AND SPECIFIC ROLE 2001
<br /> ROLE: Design Development SIZE: 1.45 MIL SF COST: $70 million
<br /> Expansion of the D-E-F Wrap which included new facilities - check-in counters for passengers, relocation of administrative offices, and additional CONSTRUCTION
<br /> retail space for Duty Free. Project also provides upgrades and renovations to aprox. 710,000 SF of existing terminal space between the D, E, F, G Unbuilt
<br /> & H concourses. The work included installation of life safety master plan, upgrade the finishes and HVAC, and general compliance with ADA on
<br /> three terminalleyels.
<br />
<br />I
<br />
<br />I
<br />
<br />c 11) TITLE AND LOCATION ICity and State) o Fill If project performed with current firm 12)YEAR COMPLETED
<br /> South Miami-Dade Cultural Center, Miami, FL PROFESSIONAL SERVICES
<br /> (31 BRIEF DESCRIPTION (Brief scope size, cost, etc) AND SPECIFIC ROLE 2002
<br /> ROLE: Construction Documents SIZE: 68,000 SF COST: $44 million
<br /> The South Miami-Dade Cultural Arts Center is conceived as a multidisciplinary center for the arts, and will serve as a showcase CONSTRUCTION
<br /> for the performing arts, Its 1,000 seat state-of-the art theater will include a fly tower, orchestra pit, front of house spaces (box Ilf Applicable)
<br /> office, lobby, restrooms, concessions, etc,), and back of house support spaces (dressing rooms, storage and work areas, adminis- 2008
<br /> trative offices, etc.).
<br />d (11 TITLE AND LOCATION IC,ty and State) (2IYEAR COMPLETED
<br /> One Miami Residential Towers, Miami, FL . Fill If prOject performed With current flml
<br /> PROFESSIONAL SERVICES
<br /> 131 BRIEF DESCRIPTION (Bnef scope Size, cost, etc) AND SPECIFIC ROLE 2006
<br /> ROLE: SIZE: 1,8 MIL SF COST: $122 million CONSTRUCTION
<br /> A residential development with 896 high-end condo units looking out the Biscayne Bay, distribuited in two towers of 44 and 45 Ilf Applicable)
<br /> stories, with a 1,000 plus cars parking garage, an elevated pool and amenities deck. Also with 70,000 SF of office space and (2) 2006
<br /> restaurants overlooking the water.
<br />e 111 TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> Marina Blue Residential Towers, Miami, FL . Fill If prOject performed with current firm
<br /> PROFESSIONAL SERVICES
<br /> 131 BRIEF DESCRIPTION IBrief scope SIZe, cost, etc.) AND SPECIFIC ROLE 2006
<br /> ROLE: Project Manager SIZE: 1,2 MIL SF COST: $105 million CONSTRUCTION
<br /> Is a 516 high-end residential units tower rising to 60 stories over Biscayne Boulevard and overlooking Biscayne Bay, Mixed- i1f Applicable)
<br /> use development with retail space at the base of the podium and office / lofts sharing the 8 levels, 800 cars parking garage. 2007
<br /> Amenities level at 14 floor, includes a 2 acres beach club with (2) pools, jacuzzi, fitness center, game rooms, activity center, and
<br /> business center.
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I AU IHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 '6,2004,
<br />
|