Laserfiche WebLink
<br />I <br /> <br />'I <br /> <br />II <br />II <br />!. <br />'. <br /> <br />i <br /> <br />,I <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />12. NAME <br />Fernando Gatell, PSM <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Compfete one Section E for each key person.) <br />13. ROLE IN THIS CONTRACT <br />Project Surveyor a. TOTAL <br />35 <br /> <br />14. YEARS EXPERIENCE <br />I b. WITH C~RRENT FIRM <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />F.R. Aleman & Associates, Inc., Orlando, Florida <br /> <br />16. EDUCATION (DEGREE AND SPECIALlZA nON) <br />B.D. SUNeying Camaguey School Cuba 1965 <br />B.S, Ciego de Avila Cuba 1959 <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Professional SUNeyor and Mapper <br />Florida (No. LS-0002821) <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Life Fellow with American Congress of SUNeyors & Mappers (ACSM) <br />Life Fellow with National Society of Professional SUNeyor (NSPS) <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Land Surveying SeNices, Miami-Dade Co Public Schools PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Project Manager 3/04 - Present <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE . LxJ Check if project performed with current firm <br />a. FRA currently provides various surveying and mapping services as a prime consultant on this contract. FRA has <br /> performed nearly all types of surveys including boundary, topographical, specific purpose, review of public records, title <br /> searches, elevation certificates, roof surveys, and the preparation of documents for the recording of easements. Other <br /> types of work provided to the school board GPR, underground utility location and designation. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> General Land & Engineering Survey Contract, Miami-Dade County PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Project Surveyor 2002 - Present <br />b. (3) BRIEF DESCRIPTION (Briel scope, size, cost. etc.) AND SPECIFIC ROLE !l<I_ Check if project performed With current firm <br />This project included 4 different locations, Mr. Bramwell's responsibilities on the SR826 portion of the project included the <br /> supervision and inspection of all works required for the installation of 11 CCTVs, wireless and fiber communication <br /> consisting of poles, foundations, conduit, fiber optic cable, devices, etc. Tasks also included the monitoring of field <br /> testing for integration of equipment into the ITS infrastructure. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Professional Land Surveying Services Agreement, City of Miami PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Project Manager & Surveyor 2001 - 2007 <br />c. (3) BRIEF DESCRIPTION (Brief scope. size, cost. etc.) AND SPECIFIC ROLE _ ~ Check if project performed with current firm <br />Under this contract, we provided miscellaneous surveying services, some of which included Boundaries, Right of Way, <br /> Engineering, Design Surveys, Construction Lay-Out and As-Built Surveys, Horizontal Control and Vertical control <br /> surveying for various locations with the City's jurisdiction. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Districtwide Engineering Survey Consultant, FDOT 6 PROFESSIONAL SERVICES I CONSTRUCTION (II applicable) <br /> Project Manager & Surveyor 2002 - 2006 <br />d. (3) BRIEF DESCRIPTION (Briel scope, size, cost, etc.) AND SPECIFIC ROLE ~. Check if project performed with current firm <br />Mr. Gatell served as the Project Manager for this contract, we were awarded two consecutive times. FRA is proud to <br /> have accomplished -150 successful different LOAs over a period of 7 years. The projects assigned included a multitude <br /> of surveying services which included the establishment of baselines, reference points, bench marks, cross sections, <br /> topographical features, DTM, GPS and monumentation for FDOT right-of-ways and control maps. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE LJ Check if project performed with current firm <br />e. <br /> <br />STANDARD FORM 330 (612004) PAGE 2 <br />