My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Tim Haahs Engineers
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-08-01) Prof. Design Svcs. for Heritage Park and Parking Garage
>
Responses
>
Tim Haahs Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2011 3:50:47 PM
Creation date
2/28/2011 3:44:14 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Design Svcs. for Heritage Park & Pkg Garage
Bid No. (xx-xx-xx)
07-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />II <br />I <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />{Present as many projects as requested by the agency, or 10 projects, If not specified. <br />Compfete one Section F for each Droiect.J <br />21. TITLE AND LOCATION (City and State) <br />FlU Parking Master Planning <br />Miami, FL <br /> <br />I <br /> <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br /> <br />5 <br /> <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES I CONSTRUCTION (if Applicable) <br />2007 2007 <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />I <br /> <br />a. PROJECT OWNER <br />Florida International University (FlU) <br /> <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />(305) 348-1655 <br /> <br />b. POINT OF CONTACT NAME <br />William Foster <br /> <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br />I <br /> <br />Timothy Haahs & Associates, Inc. (TimHaahs) developed a masterplan/ conceptual site plans for two mixed-use developments at <br />the University, These sites are critical to support the University's growth and transform it from a commuter campus to a campus <br />where students live, learn, play, and work. The stadium site includes two 2000 car parking structures, student housing, and <br />classrooms; it also creates a student quad between the existing football stadium and performing arts center. The 8th Street site <br />includes a new 2000 car parking structure and retail. <br /> <br />I <br /> <br />I <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />a. Timothy Haahs & Miami, FL Prime Design Firm; Parking Design and Consulting <br /> Associates, Inc. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />b. Timothy Haahs & Blue Bell, PA Prime Design Firm; Parking Design and Consulting <br /> Associates, Inc. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />STANDARD FORM 330 (1/2004) PAGE 3 <br /> <br /> <br />"L...; <br />
The URL can be used to link to this page
Your browser does not support the video tag.