Laserfiche WebLink
<br />I <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 p,jrojects, If not specified, <br />Compfete one Section F for each Droiect, <br />21. TITLE AND LOCATION (City and State) <br />Hamilton Square at the University of Pennsylvania <br />Philadelphia, PA <br /> <br />I <br /> <br />I <br /> <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br /> <br />6 <br /> <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES I CONSTRUCTION (if Applicable) <br />1998 1998 <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />a. PROJECT OWNER b. POINT OF CONTACT NAME <br />University of Pennsylvania Alexandria Handago <br /> <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size. and cost) <br />The University of Pennsylvania is continuing to develop projects on its campus that will encourage students and employees to <br />consider living on or around its campus. The development of Hamilton Square by the University is one of several projects to satisfy <br />this goal. <br /> <br />I <br /> <br />I <br /> <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />(215) 573-7435 <br /> <br />I <br /> <br />The Hamilton Square project comprises several components including cinema/theater, retail stores, cafe/restaurant, and a mixed- <br />use parking garage/supermarket. TimHaahs was responsible for the functional design layout, structural engineering, and parking <br />access/revenue control specifications for the parking garage and supermarket. The principal architect was Wood and Zapata, Inc. of <br />Boston, MA. <br /> <br />I <br /> <br />The parking facility functional layout includes many challenges including providing for a 20'-0" vertical speed ramp to clear the <br />supermarket below, an upper-level shopping bag pick-up area, and one main entry/exit portal to accommodate an 800 vehicle <br />parking garage. <br /> <br />I <br /> <br />The final layout utilizes a one-way traffic system throughout with a speed ramp from grade to the parking floor above the <br />supermarket. The entry/exit provides for two entry and three exit lanes. A pay-on-foot parking access and revenue control system is <br />utilized. The parking garage, completed in 2001, is nine stories tall and measures approximately 168'-0" x 220'-0". <br /> <br />I <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br />I <br /> <br />(1) FIRM NAME <br /> <br />a. Timothy Haahs & <br />Associates, Inc. <br /> <br />Blue Bell, PA <br /> <br />I <br /> <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />(3) ROLE <br /> <br />Structural Engineering; Parking Design and <br />Consulting <br /> <br />