<br />1.11 SCHEDULE OF COMMENCEMENT AND COMPLETION DATES FOR THE <br />DESIGN. CONSTRUCTION AND OPERATIONAL DATES <br /> <br />The Design Phase must commence within 30 (thirty) days after execution of the agreement <br />between the parties. The Construction/Build Out Phase shall commence immediately once <br />substantial completion of the restaurant shell has been completed. Finally, the restaurant <br />must be complete and operational, with a certificate of occupancy being issued, no later <br />than June 1, 2010, without the express written consent of the City, which will only be granted <br />should there be circumstances beyond the reasonable control of the selected proposer. <br /> <br />1.12 INSTRUCTIONS <br /> <br />Careful attention must be given to all requested items contained in this RFP. Contractors are <br />invited to submit Submissions in accordance with the requirements of this RFP. PLEASE <br />READ THE ENTIRE SOLICIT AITON BEFORE SUBMITTING A SUBMITTAL. <br />Contractors shall make the necessary entry in all blanks provided for the responses. <br /> <br />The entire set of documents, together with all attachments hereto, constitutes the RFP. The <br />proposer must return these documents with all information necessary for the City to properly <br />analyze the response in total and in the same order in which it was issued. Proposer's notes, <br />exceptions, and comments may be rendered on an attachment, provided the same format of <br />this RFP text is followed. All responses to this RFP shall be returned in a sealed envelope or <br />package with the RFP number and opening date clearly noted on the outside of the envelope. <br /> <br />Proposers must provide a response to each requirement of the RFP. Responses should be <br />prepared in a concise manner with an emphasis on completeness and clarity. <br /> <br />1.13 CHANGES/ALTERATIONS <br /> <br />Proposers may change or withdraw a response at anytime prior to the submission deadline; <br />however, no oral modifications will be allowed. Written modifications shall not be allowed <br />following the submission deadline. <br /> <br />1.14 SUB-CONTRACTOR(S) <br /> <br />A Sub-Contractor is an individual or firm contracted by the proposer or proposer's firm to <br />assist in the performance of services required under this RFP. A Sub-Contractor shall be <br />paid through the proposer or proposer's firm and shall not be paid directly by the City. Sub- <br />Contractors are allowed by the City in the performance of the services delineated within this <br />RFP. However, the proposer must clearly reflect in its Submission the major Sub- <br />Contractors to be utilized in the performance of the required services. The City retains the <br />right to accept or reject any Sub-Contractors proposed in the response of selected proposer at <br />anytime prior to contract execution. <br /> <br />Any and all liabilities regarding the use of a Sub-Contractor shall be borne solely by the <br />selected proposer and insurance for each Sub-Contractor must be maintained in good <br />standing. Neither successful proposer nor any of its Sub-Contractors are considered to be <br />employees or agents of the City. Failure to list all Sub-Contractor(s) and provide the <br /> <br />12 <br />