Laserfiche WebLink
<br />18. Do the services also include sand removal and restoration? <br />Yes. There is a cost in there, if there is a wash over and sand comes up at the point where it gets <br />to the right-of-way on the east side of AlA and to the west, sand removal would be included ifit <br />would be needed. It is in there for removal and screening, it is all together and it will have to be <br />placed back out. They are included on the unit price schedule, it is the last item at the top of <br />page 44, Section 3.0 Sand Collection and Screening. <br /> <br />19. When you evaluate the bids, will there be a selection committee or will it be in-house staff? <br />It will be in-house with staff and consultants. <br /> <br />20. Will you be posting the sign-in sheet on Demand Star? <br />Yes, and at the end of meeting, please drop off your business cards. <br /> <br />To reiterate, it is the lowest responsible responsive bidder which does not necessarily mean the <br />lowest dollar and cents amount. <br /> <br />The Pre-Proposal Conference was concluded at 10:40 a.m. <br /> <br />08-07-01 Addendum No.1 Prebid Minutes. doc <br /> <br />Page 7 of 7 <br />