Laserfiche WebLink
<br />o <br /> <br />o <br /> <br />o <br /> <br />Project Invoicing & Billing Overview <br /> <br />With AshBritt's extensive past experience and advanced debris tracking system, DIMS, we can ensure streamlined and <br />accurate reporting and invoicing which adheres strictly to established FEMA guidelines. We can accommodate weekly <br />or bi-weekly billing cycles that are preceded by pre-invoice data reconciliations. This encompasses both unit and <br />hourly services. Our streamlined process, which has been field tested over the past five years, has become our standard <br />operating procedure and is now conducted for all invoice submittals. As we separately track recovery service data <br />through DIMS and through other field reporting, all costs we invoice are segregated accordingly and clearly delineated <br />on all invoices. All other salient information is clearly identified on invoices, and applicable backup is attached in a <br />clear and concise fashion. This procedure increases both invoice clarity and accuracy. Our current goal for unit work is <br />to submit pre-invoice reconciliation data with less than a five percent load ticket/reporting error exceptions (i.e., <br />questionable and/or challenged loads or reporting). Our procedures significantly expedite client processing, audits and <br />grant reimbursements. <br /> <br />Given the flexibility afforded us by our real-time data processing and analysis, we are also open to any process <br />suggestions by our clients. Our processes are extremely adaptable and flexible, so we can accommodate any specific <br />billing procedures or systems. Additionally, for invoice processing, all pass-through charges if applicable will be <br />consolidated and summarized by like categories and submitted to the City (or contracted agent) accordingly. All <br />applicable backup for all invoices will be included for ease of review and to facilitate timely reimbursement. A <br />simplified diagram and overview of our invoicing, reporting and documentation management procedures follows. <br /> <br />In support of accurate accounting and reporting on a field level, we use a number of manual reports and logs, which are <br />subject to a tiered approval process. Our Project Manger, in the end, is required to endorse all documents that commit <br />funds. Hourly Equipment Logs and Time Sheets are used during the emergency clearing phase. These are multi-part <br />forms which are distributed to applicable parties. In addition to completed Truck Measurement Records and Load <br />Tickets, which are scanned and stored in our database, manual Truck Measurement and Truck Load Call logs are <br />maintained. Moreover, QA/QC Deficiency Reports and other safety reports and logs are kept. All reports are collected <br />and compiled by field supervisors and managers and routed daily to our central processing office, where our Project <br />Manger reviews as necessary. Ultimately, a process is established to collect all the documentation needed to validate the <br />location, time, type, length, and quantity of services conducted. <br /> <br />Per any City (or contracted agent) guidance and instruction, AshBritt will submit all project invoices with all applicable <br />backup and supporting documentation as required for validation of their correctness. AshBritt will include as backup for <br />all billing periods hard copies of the actual debris load tickets, hard copies of all landfill weight tickets (as applicable), <br />hard copies of the all data in an Excel spreadsheet format, and electronic files of the Excel spreadsheet in an acceptable <br />format to the City. Ash Britt recognizes that payments will not be made based off of incorrect invoices; however, if our <br />pre-invoice data reconciliation process is followed, all invoices should be fast-tracked for approval and payment. If a <br />submitted invoice is erroneous, AshBritt will correct all errors and submit a revised invoice for payment. AshBritt will <br />not bill for any debris collected in areas located outside of the City, nor any ineligible debris (if deemed such), nor will <br />we bill duplicate tickets. <br /> <br />Our backup data and Excel spreadsheet will include, at a minimum and as applicable, the following for each load <br />collected: <br /> <br />. Date of Load . FEMA Approved Cubic Yardage of debris <br />. Time of Load disposed (if applicable) <br />. Street Name and Area . Corresponding Invoice Number <br />. Debris Hauler Name (Subcontractor) . Ticket Number <br />. Truck Number (Certs, as necessary) . Landfill Disposal Ticket Number (if applicable) <br />. Certified Truck Capacity in cubic yards (Certs and . Landfill Disposal Weight (if applicable) <br /> Truck Record logs, as necessary) . Disposal Type, (Le. Landfill, Incineration) <br /> <br />Hardcopies of the backup data spreadsheets accompanying all invoices will contain data and information pertaining <br />only to the submitted applicable invoice. The spreadsheet included with each invoice will depict one sheet with data and <br />information pertaining only to the invoice being submitted and a second sheet, which summarizes all data and <br />information from the project to date (Le., a cumulative total). Furthermore, any additional data and information in any <br />required format for which the City may request, will be supplied. <br /> <br />AshBritt, Inc. I Sunny Isles Beach, FL I RFP No. 08-07-01 <br /> <br />78 <br />