My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-02) City Hall Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2011 5:06:25 PM
Creation date
3/28/2011 4:25:00 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Hall Improvements
Bid No. (xx-xx-xx)
08-05-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />d) <br /> <br />subtract the aQQreQate of the previous payments made bv the <br />Owner; <br />subtract the shortfall. if any. indicated bv the Contractor in the <br />supportinQ records and other evidence as mutuallv aQreed <br />between the Owner or EnQineer and Contractor to demonstrate <br />expenditures incurred to substantiate prior Applications for <br />Payment. or resultinQ from errors subseQuentlv discovered bv <br />Owner. or desiQnee; <br />subtract the amounts. if any. for which the Architect has withheld <br />or nullified Certificate for Payment in accordance with the <br />provisions of the Contract Documents." <br /> <br />e) <br /> <br />f) <br /> <br />In Paragraph 14.02.B., change the beginning of the sentence~.from "Ten days..... to read~ <br /> <br />_-"Forty-five days...... <br /> <br />In ParaQraph 14.02.C.1, insertthefollowinQ: <br /> <br />2. <br /> <br />3. <br /> <br />4. <br /> <br />Final Version <br /> <br />5. <br /> <br />The Contractor shall promptlv pay each subcontractor. upon receipt of <br />payment from the Owner, out of the amount paid to the Contractor on <br />account of such Subcontractor's portion of the Work. the amount to which <br />said Subcontractor is entitled, reflectinQ percentaQes actuallv retained from <br />payments to the Contractor on account of such Subcontractor's portion of the <br />Work. The Contractor shall. bv appropriate aQreement with each <br />Subcontractor. require each Subcontractor to make payments to <br />Subsubcontractors. if such Subsubcontractors are permitted bv the Contract <br />Documents, to make payments to Subsubcontractors in the same manner. <br />Neither the Owner nor the EnQineer shall have an obliQation to pavor see to <br />the payment of money to a Subcontractor. except as provided bv law. <br />Payment bv Contractor to material suppliers shall be treated in the manner as <br />provided in ParaQraph 14.02.C.2. <br />Except with the Owner's prior approval. payments to Subcontractors shall be <br />subject to RetainaQe of not less than ten percent (10%). The Owner and the <br />Contractor shall aQree upon a mutuallv acceptable procedure for review and <br />approval of payments and retention for Subcontractors. <br />Upon mutual aQreement bv Owner and Contractor. payment in full may be <br />made to those Subcontractors whose Work is fullv completed durinQ the earlv <br />staQes of the Project. NotwithstandinQ ParaQraphs 14.02.A.8 and 14.02.C.5 <br />above, at such times as the Work as set forth in the schedule of values has <br />been 50% completed. and upon mutual aQreement of the Owner and <br />Contractor, no further RetainaQe shall be withheld from proQress payments <br />with respect to such portion of the Work. AQreement as to any such <br />reduction in retained amounts will not constitute a waiver of or otherwise <br />preiudice the Owner's riQht to subseQuentlv reinstate full retainaQe. as to that <br />subcontractor, should circumstances iustify such action in the Owner's sole <br />iudQment. <br />Upon Substantial Completion of the entire Work of the Contractor. a sum. <br />sufficient to increase payments to the Contractor to one hundred percent <br />(100%) of the Contract Sum, less amounts. if any for incomplete Work and <br />unsettled claims. shall be paid to Contractor with the next sequential payment <br />application after Substantial Completion is obtained. <br /> <br />6. <br /> <br />7. <br /> <br />00800-9 <br /> <br />+- --... '1 Formatted: Right: 0.5" <br /> <br />Formatted: Right: 0.5", Numbered + Level: 1 <br />+ Numbering Style: 1, 2, 3, ... + Start at: 2 + <br />Alignment: Left + Aligned at: 0.25" + Tab <br />after: 0.75" + Indent at: 0.75" <br />
The URL can be used to link to this page
Your browser does not support the video tag.