Laserfiche WebLink
<br />Delete ParaQraph 14.05 and replace with the followinQ: <br /> <br />A. The Owner may OCCUpy or use any completed or partiallv completed portion of <br />the Work at any staQe when such portion is desiQnated bv separate <br />aQreement with the Contractor. provided such occupancy or use is consented <br />bv the insurer. in accordance with ParaQraph 5.06.A.5 and as authorized bv <br />public authorities havinQ jurisdiction over the Work. Such partial occupancy <br />or use may commence whether or not the portion is substantiallv complete. <br />provided Owner and Contractor have accepted in writinQ the responsibilities <br />assiQned to each of them for payments. RetainaQe. if any. security. <br />maintenance. heat. utilities. damaQe to Work and insurance. and have aQreed <br />in writinQ concerninQ the period for correction of Work and commencement of <br />warranties required bv the Contract Documents. When the Contractor <br />considers a portion substantiallv complete. the Contractor shall prepare and <br />submit a comprehensive list to the EnQineer of the items to be completed or <br />corrected prior to final payment. The Failure to include an item on such list <br />does not alter the responsibilitv of the Contractor to complete all Work in <br />accordance with the Contract Documents. Consent of the Contractor to <br />partial occupancy or use shall not be unreasoanbalv withheld. The staQe of <br />the prOQress of the Work shall be determined bv written aQreement between <br />the Owner and the Contractor. or if no aQreement is reached. by decision of <br />the EnQineer. <br /> <br />B. Immediatelv or prior to such partial occupancy or use. the Owner. Contractor. <br />and EnQineer shall iointlv inspect the area to be occupied or the portion of the <br />Work to be used in order to determine and record the condition of the Work. <br /> <br />C. Unless otherwise aQreed upon. partial occupancv. or use of a portion or <br />portions of the Work shall not constitute acceptance of the Work not <br />complvinQ with the Contract Documents." <br /> <br />In tho first sontence of Paragraph 14.05.1\.2., following the word .....\JI!ork...". insert the worde <br />.....or to plaoe and install oQuipment...... <br /> <br />At the end of Para€jral3h 14.07.A.2, after, ...'....ith tho Work. Insort, "(i'l) aooeptanoe by the <br />Ownor-s and go'.'erning agonoioG <br />After the least sentence in ParaQraph 14.04.B. insert the followinQ: <br /> <br />"C. Once 1) the definitive certificate of completion has been issued to the Owner <br />and the Contractor and 2) once consent of the surety. if any. has been <br />obtained. the Owner shall make payment of Retainaoe applvinQ to such Work <br />or desiqnated portion thereof. Such payment shall be adjusted for Work that <br />is incomplete or not in accordance with the requirements of the Contract <br />Documents." <br /> <br />After the last sentence in the ParaQraph 14.04.B. insert the followinQ: .; <br /> <br />"Final payment, constitutinQ the entire unpaid balance of the Contract Price. shall <br />be made bv the Owner to the Contractor when the Contractor has fullv performed <br /> <br />Final Version <br /> <br />00800-10 <br /> <br />Formatted: Indent: Left: OS', Hanging: <br />0.25", Right: 0.5" <br /> <br />+------f Formatted: Indent: Left: 0.5", Right: 0.5" <br />