<br />Copyright 2002 AIA <br /> <br />MASTERSPEC <br /> <br />11/02 <br /> <br />1.7 GENERAL CONSTRUCTION CONTRACT <br /> <br />A. Work in the General Construction Contract includes, but is not limited to, the following: <br /> <br />1. Site preparation, including clearing, building demolition and relocations, and earthwork. <br />2. Site improvements, including roadways, parking lots, pedestrian paving, site <br />development furnishings and equipment, and landscaping. <br />3. Tunnels for site utilities. <br />4. Selective demolition. <br />5. Foundations, including footings, foundation walls, and piles. <br />6. Slabs-on-grade, including earthwork, subdrainage systems, and insulation. <br />7. Below-grade building construction, including excavation, backfill, and thermal and <br />moisture protection. <br />8. Superstructure, including floor and roof construction and sprayed fIre-resistive materials <br />and board fIre protection. <br />9. Exterior closure, including walls, parapets, doors, windows, and louvers. <br />10. Roofmg, including coverings, flashings roof specialties and glazed openings. <br />11. Interior construction, including partitions, doors, interior glazed openings, and fIttings. <br />12. Fire-protection specialties. <br />13. Stairs, including railings and fInishes. <br />14. Interior fInishes, fInish carpentry, architectural woodwork and built-in casework. <br />15. Miscellaneous items, including concrete equipment bases and painting of mechanical and <br />electrical work. <br />16. Conveying systems, including elevators and wheelchair lifts, escalators, and cranes. <br />17. Equipment, including stage equipment projection screens, loading dock equipment, waste <br />compactors, foodservice equipment, residential appliances, and laboratory fume hoods. <br />18. Furnishings, including casework, window treatments, floor grilles and mats, and seating. <br />19. Special construction, including the following: <br /> <br />a. Preengineered structures. <br />b. Special-purpose rooms. <br />c. Radiation protection. <br /> <br />B. Temporary facilities and controls in the General Construction Contract include, but are not <br />limited to, the following: <br /> <br />1. Temporary facilities and controls that are not otherwise specifIcally assigned to the <br />Plumbing Contract, Mechanical Contract, and Electrical Contract. <br />2. Sediment and erosion control. <br />3. Unpiped sewers and drainage, including drainage ditches, dry wells, stabilization ponds, <br />and containers. <br />4. Stormwater control. <br />5. Unpiped temporary toilet fIxtures, wash facilities, and drinking water facilities, including <br />disposable supplies. <br />6. Temporary enclosure for building exterior, except as indicated. <br />7. Temporary roads and paved areas. <br />8. Dewatering facilities and drains. <br />9. Excavation support and protection, unless required solely for the Work of another <br />contract. <br /> <br />SUMMARY OF MULTIPLE CONTRACTS <br /> <br />01125 - 5 <br />