Laserfiche WebLink
<br />Copyright 2002 AIA <br /> <br />MASTERSPEC <br /> <br />11/02 <br /> <br />10. Special or unusual hoisting requirements for construction activities, including hoisting <br />loads in excess of 2 tons (2000 kg), hoisting material or equipment into spaces below <br />grade, and hoisting requirements outside building enclosure. <br />11. Project identification and temporary signs. <br />12. General waste disposal facilities. <br />13. Pest control. <br />14. Temporary stairs. <br />15. Temporary fITe-protection equipment. <br />16. Barricades, warning signs, and lights. <br />17. Site enclosure fence. <br />18. Covered walkways. <br />19. Security enclosure and lockup. <br />20. Environmental protection. <br />21. Restoration of Owner's existing facilities used as temporary facilities. <br /> <br />1.8 PLUMBING CONTRACT <br /> <br />A. Work in the Plumbing Contract includes, but is not limited to, the following: <br /> <br />1. Site water supply and distribution. <br />2. Site sanitary sewerage. <br />3. Site storm drainage. <br />4. Site fuel distribution. <br />5. Site special plumbing systems. <br />6. Plumbing fixtures. <br />7. Domestic water distribution. <br />8. Sanitary waste. <br />9. Stormwater drainage. <br />10. Special plumbing systems, including the following: <br /> <br />a. Compressed air. <br />b. Deionized water. <br />c. Distilled water. <br />d. Fuel oil. <br />e. Natural gas. <br />f. Medical gas. <br />g. Vacuum. <br />h. Acid waste. <br />1. Pools and fountains. <br /> <br />11. Fire-suppression systems. <br />12. Special fITe-suppression systems, including the following: <br /> <br />a. Foam fITe-extinguishing systems. <br />b. Clean-agent extinguishing systems. <br /> <br />13. Plumbing connections to equipment furnished by the General Construction Contract. <br /> <br />B. Temporary facilities and controls in the Plumbing Contract include, but are not limited to, the <br />following: <br /> <br />SUMMARY OF MULTIPLE CONTRACTS <br /> <br />01125 - 6 <br />