My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Weekly Asphalt
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-10-01) Streetscape Improvements
>
Responses
>
Weekly Asphalt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2011 5:17:15 PM
Creation date
4/5/2011 4:58:27 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Streetscape Improvements
Bid No. (xx-xx-xx)
08-10-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />just the County will inspect the streetlight system? <br />Both will do it, the County will have the final say-so, but our Building Department City <br />Electrician will take a look at it as well, and that permit that you pull will enact them to <br />go out and take a look at it. <br /> <br />13. The permit that we are pulling from Miami-Dade County? <br />Correct. <br /> <br />J4. Does the City have Electrical Inspectors along the way because the County usually has final <br />inspection and that is it. <br />Yes, we will have a rough and final inspection. We will have an inspector assigned to <br />the project that you can coordinate your efforts with along with our Project <br />Management Team. <br /> <br />15. In regards to lane closures and MOT, just by the book for DOT Specs or do you have <br />superseded specs on that? <br />It would be DOT standards, even though you are free to modify the standard if you see <br />a better way to keep the traffic flowing. <br /> <br />16. The work in the right-of-way, is there any time restrictions on that? <br />That is not addressed. <br /> <br />17. Typically it is 9:00 a.m. to 3:00 p.m. <br />Yes, that is typical. <br /> <br />18. You don't have the FDOT Permit in yet? <br />No, but they have reviewed it, and we should be getting that permit very shortly. <br /> <br />19. It is their road, right? <br />That is correct but there are portions of this Project that are outside of their right-of- <br />way, behind the Retention Area on the south side of 189tb Street. A portion of that is <br />City property. <br /> <br />20. Does FDOT impose restrictions at the time they issue a permit? <br />Yes. <br /> <br />21. Will that be available before bid time? <br />Weare not certain of that. <br /> <br />22. Would you be allowed to work weekends? <br />It will be on a case-by-case basis, we will see. <br /> <br />23. FOOT closes one lane, the inside lane? <br />Yes, FDOT will approve that permit but our standard and our requirement here in the <br />City is if you are going to close a lane, you will have to hire an off-duty Police Officer <br />which needs to be incorporated into your MOT. There will be a pre-job meeting, a pre- <br /> <br />SASQ961127 <br /> <br />Page 5 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.