My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Weekly Asphalt
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-10-01) Streetscape Improvements
>
Responses
>
Weekly Asphalt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2011 5:17:15 PM
Creation date
4/5/2011 4:58:27 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Streetscape Improvements
Bid No. (xx-xx-xx)
08-10-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />, <br /> <br />Daniel D. Weekley <br />Project D[['ector~ Pn:l:sident <br /> <br /> <br />Expertise <br /> <br />Construction Management <br />Construction Administration <br />Dispute Resolution <br /> <br />Education <br /> <br />Hollywood Hills High School <br /> <br />Experience <br /> <br />38 Years <br /> <br />Professional History <br /> <br />Weekley Asphalt Paving, Inc., President, 1975 - <br />Present <br />Weekley Asphalt Paving, Inc., <br /> <br />Professional Affiliations <br /> <br />Vice President - Five Star Rodeo, Inc. <br />President - Southeast Cattle Company, Inc. <br />Vice President - Weekley Brothers Nursery, Inc. <br />President - Engineering Contractors Association of <br />South Florida <br />Board Member - Florida Transportation Road <br />Builders <br />Board Member and Past President - Asphalt <br />Contractors Association <br />Past City Commissioner of the Town of Pembroke <br />Park <br /> <br />. <br /> <br />. <br /> <br />Mr. Weekley has been working for Weekley <br />Asphalt Paving, Inc. since 1967. While attending <br />high school he worked in the various departments <br />including asphalt crews from which he advanced <br />through the ranks to Foreman and Superintendent. <br />In 1975, Mr. Weekley was appointed the President <br />of Weekley Asphalt Paving, Inc. overseeing the <br />complete operations of the Company. <br /> <br />Sawgrass Expressway Sunrise Boulevard, <br />Florida Department of Transportation (11/04 - <br />2/05) - Served as Principal Officer for the milling, <br />asphalt, concrete, roadway widening and <br />signalization for this project. Also included in the <br /> <br />scope of services was Maintenance of Traffic <br />(MOT) and electrical work. <br /> <br />SR 94 (Kendall Drive) Safety Improvements, <br />Florida Department of Transportation (4/04 - <br />8/04) - Safet~ improvements between Kendall <br />Drive fromth149h Avenue to S.W. 13ih Avenue. <br />N.W. 79 Street, Florida Department of <br />Transportation (5/04 - 6/04) - City of Miami <br />intersection improvement, roadway widening, <br />environmental monitoring. <br /> <br />N.W. 27th Avenue (SR 9) at N.W. 11th Street, <br />Florida Department of Transportation (1/04 - <br />3/04) - Intersection improvement including paving, <br />milling and concrete. Additional work included <br />Maintenance of Traffic (MOT) and electrical <br />support services. <br /> <br />Commercial Boulevard and Florida Turnpike, <br />Florida Department of Transportation (12/02 - <br />8/03) - Commercial Boulevard interchange <br />improvements that included asphalt, paving, <br />guardrail, pavement markings, etc. <br /> <br />U.S. 27 Bridge Repair, Florida Department of <br />Transportation (10/02 - 1/03) - Project included <br />bri~ge repairs, environmental monitoring, <br />Mamtenance of Traffic (MOT), direct client <br />interaction, coordination with construction engineer <br />inspectors, and compliance with contract <br />documents. <br /> <br />A1A and Hillsboro Boulevard, Florida <br />Department of Transportation (8/02 - 1/03) - <br />Intersection improvement included milling, <br />resurfacing and Maintenance of Traffic (MOT). <br /> <br />SR 7 between Commercial Boulevard and <br />Prospect Road, Florida Department of <br />Transportation (2/02 - 12/02) - Resurfacing <br />project that included paving, milling, concrete and <br />Maintenance of Traffic (MOT). <br />
The URL can be used to link to this page
Your browser does not support the video tag.