My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Green Construction Technologies
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-10-01) Streetscape Improvements
>
Responses
>
Green Construction Technologies
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2011 4:53:23 PM
Creation date
4/5/2011 5:25:38 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Streetscape Improvements
Bid No. (xx-xx-xx)
08-10-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />10-02-'08 10:01 FROM- <br />/ <br /> <br />T-263 P002/003 F-854 <br /> <br />STAlE 01' FLORIDA DEPAATME~T OF TMNSPORTATIOI< <br /> <br />S75-021l-43 <br />MAINTENANCE <br />O./C14 <br /> <br />CONTRACTOR <br />FIELD PERFORMANCE REPORT <br /> <br />. Periodic <br />Qlnitlal <br />o Final <br /> <br />RATING <br />~8.0OJ <br /> <br />Green Construction Technologies <br />Contractor Name <br /> <br />Date: September 2. 2008 <br />I <br />I <br />410204-4-52-01 I' <br />FIN. ProJact lo's <br /> <br />Additional FIN Project 10'& (if applicable) <br /> <br />E4i90 <br />Contract No. <br /> <br />I <br />!. <br />$600.000.00 <br />Onglnal Contract Amount <br /> <br />Concrete ADA Ramps. Sidewalk, a~d Curb & Gutter <br />Type of Work <br /> <br />Grading Instruc:tlons <br /> <br />10 - Outstanding <br />9 - ElCcellent <br /> <br />8 - Good <br />7 - Satisfactory <br /> <br />5 - Unsatisfactory <br />3 - Poor <br /> <br />Grade <br /> <br />1. Prosecution. control and timely completion of the work. 10.0 <br />2. Overall quality control and compliance with contract. 10.0 <br />3. On-Site supervision and staffing (no. and skillleval). 100 <br />4. Quantity, SUitability and effectiveness of equipmsnt. 10.0 <br />5. Maintenance of traffic operation!>. 10.0 <br />6. Interface with traveling public and adjacent property owners. 10.0 <br />7. Effectiveness of ganeral management. 9.0 <br />8. Furnishing of required documents and reports. 9.0 <br />9. Cooparation with Department. personnel. 10.0 <br />'0. Final clean-up of work site. 10.0 <br />Raw Score'" 98.0 <br /> <br />Note: <br /> <br />1. If all Items are gradad, tha maximum rating attainable is (100). <br />2. tf any items do not apply mark 'hem N1A and use the following formula: <br /> <br />I <br />I <br />I <br />I <br />I <br />Ii <br />( ~ Max Rating Attainable) <br />I <br /> <br />Max Rating Attainable'" 100 - ( 10 (Max. grade per item) x ~ (No. of Items marked N/A)) " <br /> <br />. <br /> <br />\ <br /> <br />98 <br />(Raw Score) <br /> <br />+ <br /> <br />100 X '00;:; <br />. (Max. Rating Attainable) <br /> <br />98 <br />(Rating) <br /> <br />Performance Rating '" <br />
The URL can be used to link to this page
Your browser does not support the video tag.