My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Green Construction Technologies
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-10-01) Streetscape Improvements
>
Responses
>
Green Construction Technologies
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2011 4:53:23 PM
Creation date
4/5/2011 5:25:38 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Streetscape Improvements
Bid No. (xx-xx-xx)
08-10-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />10-02-'08 10:02 FROM- <br />/ <br /> <br />T-263 ~003/003 F-854 <br /> <br />)75-0Z0.43 <br />IoIA1NTENANCE <br />04105 <br /> <br />ENGINEERS REMARKS SUPPORTING GRADES <br /> <br />I <br /> <br />1. This contractor starts work, progr8&&B& and completes all work In a highly expedient manner. The quick work alsO <br />nstnJction areas to be opened to pedestrians well before planned completion dates. f. <br />I <br />I <br /> <br />allows <br /> <br />. Conlrac;tgr has done 8n outstanding job to date. The quallt'i of the work is superb. <br />I <br />. I: <br />. Supervision is great and there is always a full complement 0' wolkers on sile. Both the prime and $ub-contrac;lo~ worker$ h"VEl <br />with their respective companies for a long period of lime, thus the skJIIlevels are very high. I <br />I <br />. All equipment is in great condition. No break downs or equipment issues during this period. I <br />. . ~ <br />. . Maintenance of traffic devices are set up, maintained. and removed per standard. Periodic traintng is given and 'he onslle supervisor <br />& well versed and lakes pride in safe work Brea wolk. Wori<ers are solely devoted to maintenance of MOT and flag'ging during tane <br />U~. . I <br /> <br />. On numerous occasions the contractor has had to coordinate with adjOining busine&ses and home owne~ for tlmporary closures of <br />riveways. This coordination has been outstanding with compliments received. . I <br />I <br />. Other than a few minor issues at the beginning of the Job, management has been excellent. I <br /> <br />, After a short leaming period at the beginning, all documents, invoices and reports are submitted promptly and ~ccurate, <br />I <br /> <br />. Offica and field personnel are highly cooperative, Many limes the contractor has responded to an urgent need by the department <br />. in hours. The company has been the mosl cooperative of any this rater has ever worked WIth. I <br />I <br />O. Site deanup is superb. The wor1< site is always left much better then it was before work started. <br /> <br /> <br />(Attach Additional Remarks) <br /> <br /> <br />Reviewed By: <br /> <br />I, <br />Maintenance Contract Engineer <br />I <br /> <br />Submitted By: <br /> <br />CONTRACTOR <br />(SIgnature doe, nor indicata concurrence) <br /> <br />\. <br /> <br />Area Maintenance Engi~er <br /> <br />Reviewed By: <br /> <br />COPIES: <br />Connaor <br />Project File <br />DIstriCt Malnwnance Engineer. Origmal <br />Am MaintllFlal1C8 Engineer <br /> <br />District Malntanance Enginaer <br /> <br />II. <br />II <br />
The URL can be used to link to this page
Your browser does not support the video tag.