My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AGC Inc
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-10-01) Streetscape Improvements
>
Responses
>
AGC Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2011 5:10:15 PM
Creation date
4/11/2011 5:09:32 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Streetscape Improvements
Bid No. (xx-xx-xx)
08-10-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />J <br /> <br />A.G.e. <br /> <br />AGC Consulting Civil Engineers & General Contractors, Inc. <br />10305 NW 41 st Street, Suite 115, Doral, Florida 33178 <br />Ph: 305.592.7283 Fax: 305.593.1594 <br /> <br /> <br />KEY QUAUFICf:nONS <br />Mr. Acosta brings over 19 years of experience as General Contractor and 23 <br />years as designer of infrastructure / transportation projects. He spent the first <br />thirteen years of his career working for the Florida Department of Transportation <br />District VI internal design office in the production of roadway plans from minor <br />roadway design to major reconstruction projects. During the last two years of his <br />career at FDOT, he worked as District VI Roadway Design Project Manager where <br />he was head of an Internal Design Team working on a large number of milling <br />and resurfacing, limiting access facilities and reconstruction projects. He's <br />working today as the Roadway & Infrastructure Task Manager for the Miami <br />Intermodal Center (MIC). He is a 1985 graduate of Florida International <br />University with a Bachelor's Degree in Civil Engineering. He is currently a <br />member of the Cuban-American Association of Civil Engineers (C-AACE). <br /> <br />RELEVANT UiPE~IENCE <br /> <br />President Superplaza Shopping Center <br />Client: Garant Enterprises (Orlando Benitez 305.310.3969) <br />General Contractor and Engineer of Record for the development of the Civil Site <br />Construction Plans for this new 82,000 Sq. Ft. Shopping Plaza center with more <br />than 350 parking spaces, located at 11300 Quailroost Drive, Miami, Florida. <br />Construction Cost. $5,200,000.00. In charge of Construction, Quality Control <br />and Management of all construction aspect of this site as well as the <br />administration, coordination and management of the company and <br />subcontractors. Project include the paving & drainage for the entire site <br />approximately 8.2 Acres, 24 Drainage Structures, 800 If of French Drains, and <br />21,200 SY of 8" Lime-rock Base & Asphalt, 12-inch water main installation of <br />approximately 1340 If, 2-inch water main installation of approximately 1850 If, <br />8-inch sewer main installation of approximately 1500 If, 4-inch sewer main <br />installation of approximately 350 If, and 6-inch sewer main installation of <br />approximately 60 If. Completion Date: April, 2001. <br /> <br />Miami Intermodal Center Miami, Florida <br />Client: FOOT District VI (Gary Donn, P.E. 305.470.5401) <br />Roadways and Infrastructure Task Manager for the MIC Management Group. In <br />charge of the development of Drainage and Utility Master Plan for this 1.3 billion <br />dollar mega project. Also in charge of coordinating all the development of all the <br />Roadway Plans, including Geotechnical, Survey, Right of Way, and utilities. <br />Responsible for coordination with all different agencies having projects in the <br />area like MDX, Miami Dade County Public Works, City of Miami, Miami <br />International Airport, etc. <br /> <br />Tropical Supermarket <br />Client: Omar Rodriguez 305.541.0024 <br />General Contractor and Engineer of Record for the development of the Civil Site <br />Construction Plans for this new 19,600 Sq. Ft. Shopping Plaza with 38 parking <br />spaces, locate at 2199 NW 36 St., Miami, Florida. In charge of the <br />administration, coordination and management of the company. Project include <br />the paving & drainage for the entire site approximately 0.75 Acres, 4 Drainage <br />Structures, 170 If of French Drains, and 250 SY of 8" Lime-rock Base & Asphalt, <br />filling the site with fill, 6-inch water main installation of approximately 40 If, 6- <br />inch sewer main installation of approximately 40 If, and signing and pavement <br />markings. <br />
The URL can be used to link to this page
Your browser does not support the video tag.