<br />AGC Consulting Civil Engineers & General Contractors, Inc.
<br />10305 NW 41 st Street, Suite 115, Doral, Florida 33178
<br />Ph: 305.592.7283 Fax: 305.593.1594
<br />
<br />Palacio de los Jugos, Miami, Florida
<br />Client: Reynaldo Bermudez 305.595.3488
<br />General Contractor and Engineer of Record for the development of the Civil Site Construction Plans for this new stand
<br />alone outparcel business with 32 parking spaces, located at 14300 SW 8th Street, Miami, Florida. In charge of
<br />Construction, Quality Control and Management of all construction aspect of this site as well as the administration,
<br />coordination and management of the company and subcontractors. Project include the paving & drainage for the entire
<br />site approximately 0.5 Acres, 6 Drainage Structures, 200 If of French Drains, and 350 SY of 8" Lime-rock Base &
<br />Asphalt, filling the site with fill, 8-inch water main installation of approximately 70 If, and 6-inch sewer main installation
<br />of approximately 70 If.
<br />
<br />Residence for Mr. Omar Rodriguez
<br />Client: Omar Rodriguez 305.541.0024
<br />General Contractor for this new 10,800 Sq. Ft. Custom Home, located at 12267 S.w. 51st Street, Miami, Florida.
<br />Construction Cost. $3,500,000.00. Completion Date: February, 2002. In charge of construction, Quality Control and
<br />Management of all construction aspect of this site. Responsible for the administration, coordination and management of
<br />the company and subcontractors.
<br />
<br />Cuba Tropical, Miami, Florida
<br />Client: Omar Rodriguez305.541.0024
<br />General Contractor for the development of the Civil Site portion of the addition of an existing warehouse complex,
<br />located at 1265 NW 22nd Street, Miami, Florida. In charge of Construction, Quality Control and Management of all
<br />construction aspect of this site as well as the administration, coordination and management of the company and
<br />subcontractors. Project include the paving for the entire site approximately 333 SY of 8" Lime-rock Base & Asphalt, and
<br />filling the site with fill.
<br />
<br />MIG-Earlington Heights Connector
<br />Client: Miami - Dade Transit/ URS Corp. (Carlos Garcia, P.E> 305.262.7466)
<br />Site Civil Engineer of Record for the Miami Intermodal Center - Earlinghton Heights Station. The Miami Intermodal
<br />Center - Earlinghton Heights projects runs from the existing Earlinghton Heights Station locate next to SR-112 and
<br />approximately east of NW 27th Avenue west to the new MIC Core Facility locate next to the Miami International Airport.
<br />The project included the site civil design. Maintenance of Traffic (including SR-112 & NW 41st Street), detour plans for
<br />the MIC-Earlinghton (crossing), Signing and Pavement Marking (including SR-112 and NW 41st Street), signalization
<br />design, temporary signal, and substation design. Our site civil department, as part of the design team, has been involved
<br />in monthly coordination meetings with Miami-Dade Transit Agency representatives, architects/engineers and system
<br />consultants.
<br />
<br />Residence for Dr. & Ms. Formoso
<br />Client: Dr. Formoso 305.541.9921
<br />General Contractor for this new 6,500 Sq. Ft. Custom Home, located at 150 Isla Dorada Boulevard, Coral Gables,
<br />Florida. Construction Cost. $1,300,000.00. Completion Date: June, 2003. In charge of Quality Control and Management
<br />of all construction aspect of this site. Responsible for the administration, coordination and management of the company
<br />and subcontractors.
<br />
<br />Residence for Dr. & Ms. Nirberto Moreno
<br />Client: Dr. Nirberto Moreno 305.630.2909305.541.0024
<br />General Contractor for this new 10,500 Sq. Ft. Custom Home, located at 580 Puerta Avenue, Coral Gables, Florida.
<br />Construction Cost. $1,800,000.00. Completion Date: July, 2003. In charge of Quality Control and Management of all
<br />construction aspect of this site. ResponSible for the administration, coordination and management of the company and
<br />su bcontractors.
<br />
<br />Other Projects:
<br />· The Residence of Mr. & Ms. Mian Subhani, 5340 South Saxon Circle "Ivanhoe Estates", Ft. Lauderdale, Florida.
<br />· The Residence of Mr. & Ms. Masoud Ebrahimi, 3521 Vista Court, Cocunut Grove, Florida
<br />· The Residence of Mr. & Ms. Jorge Vallejo, 2940 N.E. 164th Street, North Miami Beach, Florida
<br />· Dunkin Donuts 8565 S.W. 24th Street, Miami, Florida