Laserfiche WebLink
<br />A.G.e. <br /> <br />AGC Consulting Civil Engineers & General Contractors, Inc. <br />10305 NW 4151 Street, Suite 115, Doral, Florida 33178 <br />Ph: 305.592.7283 Fax: 305.593.1594 <br /> <br /> <br />KEY QUALIfiCATIONS <br />Mr. Gil-Mera brings over 16 years of experience as General Contractor and 22 <br />years of experience in the Design of infrastructure and transportation projects. <br />He spent the first thirteen years of his career working for the Florida Department <br />of Transportation District VI internal design office on the production of roadway <br />plans including minor design and major reconstruction projects. During the last <br />two years of his career at FDOT, he worked as District VI Roadway Design Project <br />Manager where he was head on an Internal Design Team working on a large <br />number of milling and resurfacing and reconstruction projects. As one of the <br />principal of A&P, Mr. Gil-Mera has supervised and managed numerous <br />Construction Projects for Governmental and Private Clients. Mr. Gil-Mera is an <br />active member of the American Society of Civil Engineers, The Florida <br />Engineering Society and the Cuban-American Association of Civil Engineers <br />where he currently holds the Vice-President Position. He is a 1986 graduate of <br />Florida International University with a Bachelor's Degree in Civil Engineering. <br /> <br />RELEVANT ExPERIENCE <br /> <br />President Superplaza Shopping Center <br />Client: Garant Enterprises (Orlando Benitez 305.310.3969) <br />General Contractor and Project Engineer for the development of the Civil Site <br />Construction Plans for this new 82,000 Sq. Ft. Shopping Plaza center with more <br />than 350 parking spaces, located at 11300 Quailroost Drive, Miami, Florida. <br />Construction Cost. $5,200,000.00. In charge of Construction, Quality Control <br />and Management of all construction aspect of this site as well as the <br />administration, coordination and management of the company and <br />subcontractors. Project include the paving & drainage for the entire site <br />approximately 8.2 Acres, 24 Drainage Structures, 800 If of French Drains, and <br />21,200 SY of 8" Lime-rock Base & Asphalt, 12-inch water main installation of <br />approximately 1340 If, 2-inch water main installation of approximately 1850 If, <br />8-inch sewer main installation of approximately 1500 If, 4-inch sewer main <br />installation of approximately 350 If, and 6-inch sewer main installation of <br />approximately 60 If. Completion Date: April, 2001. <br /> <br />Miami Intermodal Center Miami, Florida <br />Client: FOOT District VI (Gary Donn, P.E. 305 470 5401) <br />Project Engineer for Roadways the MIC Management Group. In charge of the <br />development of the Utility Master Plan for this 1.3 billion dollar mega project. <br />Also in charge of coordinating all the development of all the Roadway Plans, <br />including Geotechnical, Survey, Right of Way. Responsible for coordination with <br />all different agencies having jurisdiction in the area like MDX, Miami Dade <br />County Public Works, City of Miami, Miami International Airport etc. <br /> <br />Tropical Supermarket <br />Client: Omar Rodriguez 305-541-0024 <br />General Contractor and Project Engineer for the development of the Civil Site <br />Construction Plans for this new 19,600 Sq. Ft. Shopping Plaza with 38 parking <br />spaces, located at 2199 NW 36th Street, Miami, Florida. In charge of <br />Construction, Quality Control and Management of all construction aspect of this <br />site as well as the administration, coordination and management of the <br />company and subcontractors. Project include the paving & drainage for the <br />entire site approximately 0.75 Acres. 4 Drainage Structures, 170 If of French <br />Drains, and 250 SY of 8" Lime-rock Base & Asphalt, filling the site with fill, 6-inch <br />water main installation of approximately 40 If, 6-inch sewer main installation of <br />approximately 40 If and signing and pavement markings. <br />