Laserfiche WebLink
<br />A.G.e. <br /> <br />AGC Consulting Civil Engineers & General Contractors, Inc. <br />10305 NW 41st Street, Suite 115, Doral, Florida 33178 <br />Ph: 305.592.7283 Fax: 305.593.1594 <br /> <br />Tropical Supermarket <br />Client: Omar Rodriguez <br />On-Site Supervisor for the development of the Civil Site Construction Plans for this new 19,600 Sq. Ft. Shopping Plaza <br />with 38 parking spaces, locate at 2988 NW 36th Street, Miami, Florida. In charge of Construction, Quality Control of all <br />construction aspect of this site as well as the administration, and coordination of the company and subcontractors. <br />Project include the paving & drainage for the entire site approximately 0.75 Acres, 4 Drainage Structures, 170 If of <br />French Drains, and 250 SY of 8" Lime-rock Base & Asphalt, filling the site with fill, 6-inch water main installation of <br />approximately 40 If, 6-inch sewer main installation of approximately 40 If., and signing and pavement markings. <br /> <br />Cuba Tropical, Miami. Florida <br />Client: Omar Rodriguez <br />On-Site Supervisor for the development of the Civil Site portion of the addition of an existing warehouse complex, located <br />at 1265 NW 22nd Street, Miami, Florida. In charge of Construction, Quality Control of all construction aspect of this site <br />as well as the administration, coordination of the company and subcontractors. Projects include the paving for the entire <br />site approximately 333 SY of 8" Lime-rock Base & Asphalt and filling the site with fill. <br /> <br />G2 Residence <br />Client: <br />On-Site Supervisor for this new 10,800 Sq. Ft. Custom Home located at 1835 West 27th Street, Sunset Island 2, Miami <br />Beach, Florida. Construction Cost. $2,500,000.00. Completion Date: December, 2008. In charge of construction, and <br />Quality Control of all construction aspect of this site. Responsible for the administration, coordination and management <br />of the company and subcontractors. <br />