My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-10-01) Streetscape Improvements
>
Specifications
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2011 4:33:06 PM
Creation date
4/12/2011 4:32:38 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Streetscape Improvements
Bid No. (xx-xx-xx)
08-10-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SECTION 28 <br />CONSTRUCTION SCHEDULING <br /> <br />28.1 TIME OF SUBMISSION: Contractor shall submit to the Consultant and the City a Project <br />CP.M., within 15 Days of receipt of Notice Of Award. The Project CP.M. (Critical Path Method) <br />Schedule shall be a computer generated by Primavera SureTrak (latest edition) or equivalent with <br />100% SureTrak compatibility. <br /> <br />28.2 SCHEDULE REQUIREMENTS: The schedule shall include at the minimum the following: <br />1. Activity Identification <br />2. Activity Description <br />3. Activity Duration <br />4. Remaining Duration <br />5. Early Start / Early Finish <br />6. Late Start / Late Finish <br />7. Total Float <br /> <br />28.3 Two reports shall be required: <br /> <br />28.3.1 A Classic Tabular Form including items 1 -7 listed above <br /> <br />28.3.2 A Bar Chart Report including items 1, 2, 3, and 5 listed above. The bar chart shall indicate the <br />critical path and the relationship of the identified tasks. No activity shall exceed 10 working days. <br />Activities shall be in such detail that the City and the Consultant can understand the scope of the <br />activities and the proposed / real progress. <br /> <br />28.3.3 With regard to fabrication and / or delivery of materials to the site (long lead times) the <br />Contractor shall use a duration greater than 10 working days. <br /> <br />28.3.4 The Contractor shall include the predecessor / successor listings for all activities for initial review <br />by the Consultant and the City. The City may, at its sole discretion waive the requirement of the <br />construction schedule. <br /> <br />28.3.5 The CP.M. Schedule shall include the Work outlined in the Contract Documents for the Project. It <br />shall include a complete listing of all shop drawing submittals, drawings, samples and technical <br />specifications as required by the Contract Documents. The requirements for shop drawing <br />submittals shall be directly related to their respective units of Work. The CP.M. shall clearly <br />indicate the Contractors delivery, the Consultants review and the delivery time after approval. <br />Activities associated with shop drawing submittals shall be grouped in accordance with the <br />General Requirements of shop drawing submittals and or the technical specifications for the <br />Project. <br /> <br />28.3.6 Durations applied to individual activities shall accurately depict the Work required. Capture of <br />float time shall not be allowed. There shall only be one critical path within the CP.M. Schedule. <br /> <br />28.4 METHOD OF SUBMISSION I REVISION: Contractor shall submit (1) copy on CD of all <br />Project Files to the City for review. The Contractor shall submit (5) hard copies of the report as outlined <br />in 2.0 above (Classic and Bar Chart) to the Consultant for review and comment. Contractor shall allow <br />(14) calendar days for review. Following the completion of the review, Contractor shall address all <br />comments from both the Consultant and the City within (5) calendar days. <br /> <br />PAGE 90 OF 130 <br />BID No. 08-10-01 <br />