My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Haskell
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(09-03-01) Prof. Construction Svcs. for Heritage Park & Pkg. Garage
>
Responses
>
Haskell
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2011 2:30:02 PM
Creation date
4/22/2011 2:18:56 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Construction Svcs. for Heritage Park & Pkg. Garage
Bid No. (xx-xx-xx)
09-03-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PROJECT EXPERIENCE <br /> <br />EXPERIENCE WORKING WITH AECOM (FORMERLLY SPILUS CANDELA) <br /> <br /> <br />Blue Cross and Blue Shield of Florida Parking <br />Garage <br />As part of a corporate campus expansion <br />for Blue Cross and Blue Sheild of Florida <br />(BCBSF), AECOM designed a parking garage to <br />accommodate additional employees. Originally <br />designed a cast-in-place concrete structure, <br />Haskell and AECOM worked together to redesign <br />the garage to be a precast structure, saving the <br />owner $2 million and 2 months of construction <br />time. The garage is approximately 560,000 square <br />feet with 1,500 spaces. Owner Contact: Steve <br />Davis, Blue Cross & Blue Shield of Florida (904) 905-6890 <br />AECOM Contact: Lorenzo Cobiella (305) 447-3597 <br /> <br />Blue Cross and Blue Shield of Florida Office <br />Buildings <br />_~ In an effort to consolidate their operations <br />I that were housed in numerous locations in <br />. Jacksonville, FL, BCBSF selected AECOM to <br />design multiple phases of their headquarters <br />I campus. Haskell was selected to perform <br />preconstruction and construction management <br />services. The development is on a 130-acre <br />site, currently consisting of seven office buildings <br />totaling over 1 million square feet, conference <br />center, multi-purpose training center, and full- <br />service kitchens and cafeterias. Haskell recently <br />provided CM services for the expansion of the campus to consist of two addition class A office buildings. The <br />structure is cast-in-place concrete, post-tensioned. The skin is a combination of APC and glass. Owner <br />contact: Steve Davis, Blue Cross & Blue Shield of Florida (904) 905-6890 <br />AECOM Contact: Lorenzo Cobiella (305) 447-3597 <br /> <br /> <br />Nassau County Judicial Complex <br />The multi-story 111,600 square-foot complex provides office <br />space for courtrooms, executive suites, and state and county <br />administration offices. Haskell worked with AECOM and provided <br />complete preconstruction and construction management <br />services for the project. The complex was built with a high-tech, <br />computerized building management system, controlling multiple <br />systems within the building. The building exterior is constructed of <br />concrete tilt-up panels with brick veneer and architectural precast <br />accent elements. Owner contact: Bill Howard, Nassau County <br />Board of Commissioners (904) 548-4969 <br />AECOM Contact: Don Dwore (561) 236-2870 <br /> <br />~ !!!!BI!~.!:. <br /> <br /> <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.