<br /> <br />8) Evidence of capabilities for construction scheduling, material procurement, and assurance that plans, specifications, <br />and schedules are met. <br /> <br />Scheduling <br />Project schedules are developed by utilizing similar, previous parking garage project experience of the team to list <br />and apply durations to each activity. Schedules are built activity by activity in Primavera scheduling software using <br />the critical path method. Relationships between activities, durations, lead times and lag times are all input into the <br />software. Milestones are input to establish key interim dates that become fixed schedule targets. <br /> <br />Once the schedule is <br />complete, it is checked <br />for compliance with the <br />Owner's completion <br />objectives. Time is <br />money so schedules are <br />scoured for opportunities <br />to reduce the overall <br />duration by performing <br />multiple activities at once, <br />accelerating through <br />bottlenecks and critical <br />path activities, and any <br />other schedule shortening <br />(fast-track) techniques. <br />Once complete, all <br />schedules are submitted <br />to the Owner for approval. <br /> <br />For example, Sunny Isles <br />Beach Heritage Park <br />and Parking Garage <br />project has an opportunity <br />to leverage the rapid <br />delivery and erection <br />of pre-cast concrete to <br />shorten the duration of <br />its schedule. Haskell, <br />if awarded the project, <br />will work as a team with <br />the City, AECOM, and <br />pre-cast concrete firms <br />to determine right away <br />if switching to pre-cast <br />makes sense. Please <br />see the two preliminary <br />schedules comparing the <br />two structural methods on <br />this page. <br /> <br /> 2009 ~i{. '0 <br />10 th:..u~!",n 0", flr1/ F uiy fIlAV' J~h .Ul "uO SEP OC. NQv DEe JA~. HB ,W. "PR '.'AY <br />~Lrt <, ,', <br /> ,- , ; <br />1240 SIlo Domo ond Plop 10 01JUN09 12JUN09 <br />11110 ~PIIng 3515JUHOll S 1.1ULOG <br />1120 PIoCapoond_ 20 O3AllOOQ 28AlJOOQ ~ <br /> : <br />1130 Slab on Grade 15 SIAU<108 18SEP09 C;; <br />1140 Caot__~""'_ 81 14SEP09 07DECOll ~ : <br />1150 Exter1or_T_(1llgVs) .co oeoECOll 01FEB10 ; <br />1180 SIoIm Ono" PIpklg 20 oeoECOO O4JAN10 : t=.. ; <br />1110 ~_EIedriC:al 30 oeoECOll 18JAN10 ; <br /> : <br />1200 Iotoo<o<wy-- 20 oeoeCOll O4JAN10 \0 <br />1210 SIoIr_ 20 oeoeCOll O4JAN10 : <br /> ; : ", <br />1180 E_~ 30 O5JAN10 15FEB10 : <br />1210 -_.~- 40 O5JAN10 01_,0 : <br />1220 -_.~ 30 lZJAN10 22f'EB10 ::1 <br />1230 ~ond~ 20 18fEB10 15MAR10 :ere <br />1250 P\n:lt 0uI 51_10 22_10 <br />1280 Tomp~Oocuponcy 0 22MARl0 ; : <br /> <br />Cast In Place Concrete Conceptual Schedule - Complete March 22, 2010 <br /> <br /> <br />1280 R..-lgn COo lor _ Concrele 20 01JUN09 2$JUNOll <br />12110 - Shop 0n0M1gI 30 01JUN09 10JlAJl0 <br />11110 ~PIIng 35 15JUHOll 31.1ULOG <br />1300 -- 20 2lIJUN09 2UJUll1 <br />1310 Pro-ent Shop 0rwM1g__ 101:lJl.1L.08 2UJUll1 <br />1320 PnM:nlCcncreOt_ $3 27JUU1C1 07OClOll <br />1120 PIoCapoond __ 20 03AU00lI 28AUOOll <br />1130 SIob""~ 15 SIAU<108 18SEP09 <br />1140 Pro-enlConaol E_ se 10SEP09 280CTllll <br />1150 Exter1or_T_(IIlgV,) 40 3OOCTOlI 2COECOll <br />1180 Storm Dnoln PIpklg 20 3OOCT09 28HO\I09 ~. <br />1110 lJIt<lIngondEJoctrtcol 30 3OOCTOlI 10000COll . <br />1200 Maoonly -- 20 3OOCTOlI 28NOVIl8 ~ <br />1210 S...._ 20 3OOCTOIl 28NOVIl8 <br />1180 EIova"'_ 3027NO'o'OG 07JAN10 <br /> " '" <br />1210 _~.NtIIc:_ 4027NO\/Oll 21JAN10 <br /> : :1 <br />1220 InIenor A1IstM.. ~ 30 04DECOll 14JAN10 <br />1230 S~1ng ond sv- 20 oeJAN10 04FEB10 "~ <br />1250 Punch Out 5 WEB10 l1FEB10 r. <br />1280 Tompl:eltiflc:ata lla:upM1cy l1FEB10 ~ <br /> <br />Pre-cast Concrete Conceptual Schedule - Complete Feb. 11, 2010 <br /> <br />$ !!f.!BI!~.!:. <br /> <br />12 <br />