My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Haskell
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(09-03-01) Prof. Construction Svcs. for Heritage Park & Pkg. Garage
>
Responses
>
Haskell
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2011 2:30:02 PM
Creation date
4/22/2011 2:18:56 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Construction Svcs. for Heritage Park & Pkg. Garage
Bid No. (xx-xx-xx)
09-03-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PROJECT EXECUTION <br /> <br />Another important consideration for your Heritage Park and Parking <br />Garage Project is sequencing. Haskell will sequence the project to allow <br />uninterrupted use of a majority of the surface lot during the construction <br />of the garage. Once the garage is completed, it will serve the parking <br />needs of the hotel and Public Works while we complete the park side of the <br />project. <br /> <br />Material Procurement <br />Haskell has a large network of subcontractors prepared to provide <br />competitive pricing for the Heritage Park and Parking Garage project. <br />During the estimating phase, Haskell will break down the entire project <br />into appropriate scopes of work and solicit bids from no less than three <br />qualified subcontractors for each scope of work. The low qualified bid will <br />be thoroughly interviewed and questioned to ensure completeness. Each <br />complete low price will be incorporated into the Guaranteed Maximum Price <br />(GMP) proposal and submitted to the City for approval. <br /> <br />Once approved, Haskell will enter into Subcontract agreements with each <br />low bidder included in the GMP. This process will be managed by the <br />Project Manager and supervised by the Project Director using a tool we call <br />the Purchase Control Log. This continues until all scopes are completely <br />purchased. <br /> <br />Assurance that Plans, Specifications and Schedules are Met <br />Adherence to the plans and specifications, or quality assurance (QA), is <br />a major focus at Haskell. In addition to the day to day quality assurance <br />provided by the project team, Haskell has a quality assurance department <br />that reports to the Group President. The QA Department's policies and <br />procedures are designed to ensure that the plans and specification are met <br />and include the following: <br /> <br />· Participation in design reviews and make recommendations to improve <br />quality <br />Review project specifications and make recommendations to improve <br />quality <br />· Review key submittals for compliance with design requirements <br />· With a parking garage, QA visits the pre-cast concrete plant to ensure <br />compliance with PCI and the design documents <br />· Participate and lead key pre-construction meetings with Subcontractors <br />· Perform site visits to verify compliance with plans and specifications. <br />· Implement testing programs <br />Utilize Qualigrams and Best Practices - Experience from previous <br />issues and solutions including detailed informational sheets on various <br />envelope and building systems. These include: <br /> <br />~ ~Af.!B!~!:' <br /> <br />"The project was <br />constructed while <br />working on an active <br />campus of around <br />2,500 students. <br />Haskell coordinated <br />the phasing of the <br />construction activities <br />to minimize the <br />impact to the school's <br />operations. " <br /> <br />Gene Denisar <br />Superintendent <br />School Board of Manatee <br />County <br /> <br /> <br />Joe Stonis Park <br />Cape Coral, Florida <br /> <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.