My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Haskell
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(09-03-01) Prof. Construction Svcs. for Heritage Park & Pkg. Garage
>
Responses
>
Haskell
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2011 2:30:02 PM
Creation date
4/22/2011 2:18:56 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Construction Svcs. for Heritage Park & Pkg. Garage
Bid No. (xx-xx-xx)
09-03-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PROJECT EXECUTION <br /> <br />· Floor slabs <br />· Windows <br />· Roofing <br />· Joint Sealants <br />· Flashings <br />Fluid applied barriers <br />· Develop Project Specific Quality Inspection Plans (QIP) - These plans <br />are tailored for each project based upon previous experience with <br />similar building types. For example, a QIP for a hospital will contain <br />procedures for window flashing, caulking and testing, while a parking <br />garage will contain procedures for verifying the pre-cast concrete meets <br />the standards set by The Pre-cast Concrete Institute (PCI) and the <br />specifications. QIP establishes minimum necessary steps designated <br />by AlE, Construction, and management during the various phases to <br />ensure quality for a specific building type. <br /> <br />Compliance with schedule requirements starts with the bid process. <br />Subcontractors are provided a schedule with the bid package and are <br />instructed to bid the work in accordance with the schedule requirements. <br />The successful bidder is then presented with a subcontract agreement <br />which incorporates the schedule as a contract document. Once executed, <br />they are contractually bound to deliver in accordance with the dates <br />indicated in the schedule. If a subcontractor falls behind, Haskell will take <br />whatever steps are necessary, at their expense to get them back on track. <br />These steps can include requiring them to increase their workforce, work <br />overtime, supplement their workforce, or termination and replacement. <br /> <br />9) A statement of experience summarizing projects constructed under a similar <br />development process and a summary of what the Firm can "bring to the table" for <br />the benefit of the City of Sunny Isles Beach. <br /> <br />Haskell has completed several hundred projects including numerous <br />teaming with municipalities using a similar development process to the <br />Construction Management development process used by the City of Sunny <br />Isles Beach for the Heritage Park and Parking Garage project. We have <br />also used that same process with your selected design firm, AECOM. <br />Please see our project experience in section 7 on page 11 for more details. <br /> <br />In addition to the everyday items like experience, qualified key team <br />members, etc. that everyone offers, Haskell also "brings to the table" the <br />following unique benefits for Sunny Isles Beach: <br /> <br />1. Because of our extensive parking garage design and construction <br />experience, we are able to help you and AECOM determine the right <br />structural system (pre-cast concrete vs. cast-in-place concrete) to <br />deliver the best combination of speed and cost. <br /> <br />~ !!!!BI!~l <br /> <br />"Please accept my <br />appreciation for you <br />and your staff in the <br />completion of this <br />major garage. It was <br />indeed a pleasure <br />dealing with your <br />team. The JTA is <br />appropriately proud <br />of the structure, as <br />it represents, in my <br />opinion, the most <br />attractive parking <br />structure in the <br />downtown area. " <br /> <br />Steve Arrington, <br />Director of Engineering <br />Jacksonville Transportation <br />Authority <br /> <br /> <br />Jacksonville Downtown Garage <br /> <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.