Laserfiche WebLink
<br />~~ !!!s!~!~!:' <br /> <br />3, Change Stairs from Steel to Concrete (recommended) - Haskell proposed <br />to change the metal stairs to cast in place concrete. This will be more <br />durable and corrosion resistant. Deduct $15,000 <br /> <br />4, Redesign Route of Entry Road -If selected, Haskell will complete the <br />design work necessary to re-route the garage entry road to the west at no <br />additional charQe, <br /> <br />5. Delete Vine Trainer System - (not recommended) Deduct $110,000 <br /> <br />6. Delete Fiberglass Mesh and Support (recommended) - Haskell <br />recommends deleting the fiberglass mesh and allowing us to work with you <br />and Spillis Candela to select a more cost effective solution. We suggest, and <br />our deduct includes, a $100,000 allowance for a new system. Deduct <br />$250,000 <br /> <br />7. Smooth Stucco Finish for Exterior of Stair Towers (recommended)- <br />Haskell recommends adding a stucco finish to the CMU facing the exterior of <br />the building at the stair towers. This will significantly improve their <br />appearance from the street. Add $75,000 <br /> <br />8. Eliminate Paint in stairwells (recommended) - This is most often not done <br />in parking garage projects, The advantage is obviously saving the initial cost, <br />but also reduces maintenance. Deduct $7,400 <br /> <br />9. Eliminate TexCoat on Structure (recommended) - Since the structure will <br />be hidden behind the vines, Big V's and mesh, this seems unnecessary and <br />adds maintenance cost. Deduct $55,242 <br /> <br />10. Metal Cladding to Big V's (not recommended) - ADD $750,000 for 3-sides, <br />Add $975,000 for all four sides. <br /> <br />Note: Haskell examined the option of converting the garage to pre-cast concrete; <br />however there was an increase in cost. Therefore, we are not suggesting a change in <br />the structural system, <br /> <br />CLARIFICATIONS: <br /> <br />1. All prices are firm, fixed, lump sum prices, <br />2, We do not include the cost resulting from any unforeseen underground <br />obstructions or conditions, <br />3. Our recommended price includes all the alternates above indicated to be <br />(recommended). <br />4. All demo carried in Phase 1 price <br />5. We do not include asbestos abatement or hazardous material of any kind, <br />6. We have included 100' deep drainage wells, Additional depth if required will be <br />an add of $300/LF <br />7. Phase 1 price does not include landscaping or irrigation of any kind <br />